Skip to main content

Lane Construction to carry out Florida highway deal

Lane Construction Corporation will carry out construction work worth US$134.6 million on a stretch of highway in Florida. This 21km section of the new Suncoast Parkway 2 will run to the north of Tampa, along Florida’s western coast. The route is intended to be a major transport corridor for the state and will feature four lanes. Called SR 589, the tolled route will run from South of SR 700 (US 98) to SR 44 in Hernando and Citrus Counties. Lane Construction is building the second of two sections of the Sunco
November 24, 2017 Read time: 2 mins
2878 Lane Construction Corporation will carry out construction work worth US$134.6 million on a stretch of highway in Florida. This 21km section of the new Suncoast Parkway 2 will run to the north of Tampa, along Florida’s western coast. The route is intended to be a major transport corridor for the state and will feature four lanes. Called SR 589, the tolled route will run from South of SR 700 (US 98) to SR 44 in Hernando and Citrus Counties. Lane Construction is building the second of two sections of the Suncoast Parkway 2, with the firm’s work due to commence in early 2018 and expected to require around 48 months to complete.


Lane Construction is the US subsidiary of Salini Impregilo and its work on the Florida highway project involves building 15 bridges. The work also includes milling and resurfacing, base work, drainage improvements and kerb and gutter construction. Finally Lane will install traffic signals, lighting and signing, as well as new safety guardrail, retaining walls, pedestrian walkways and a multi-use trail. Once the Suncoast Parkway 2 is opent to traffic, drivers can expect shorter commuting times while the new route will also improve sustainability by contributing to the reduction of emissions on the existing network between Citrus County and the Tampa Bay Region.

For more information on companies in this article

Related Content

  • Final touches for Seattle’s SR520 floating bridge
    November 21, 2017
    Construction crews in the US state of Washington are finishing bicycle trails and pedestrian paths leading up to the award-winning SR 520 floating bridge. The Evergreen Point Floating Bridge - officially now the Governor Albert D. Rosellini Bridge - carries Washington State Route 520 across Lake Washington in Seattle. The 2.35km-long floating span is the longest floating bridge in the world and at 35m the world's widest. It opened in April last year as a replacement for the original 50-year-old four-lane
  • Florida bridge upgrade underway
    March 21, 2022
    A major Florida bridge upgrade project is underway.
  • Making the U-turn
    August 2, 2012
    Political hostility to a toll road project in Australia has been turned around by the quality and amenity of the project writes Adrian Greeman Cars, trucks and vans were taking to the new EastLink toll road in Melbourne with enthusiasm this July, pleased to try out its 39km route for time and cost savings. As well as the convenience of the uncongested route, drivers were also able to view an extraordinary multi-shaded perspective of transparent green and orange noise wall panels, burnt earth-coloured retai
  • Roadtec machines rebuild key highway in Texas
    December 16, 2013
    In the middle of central Texas lies Blanco County, which is in the state’s Hill Country. West of Austin and north of San Antonio, the county is traversed by the Blanco River and the Pedernales River, and two major highways, US Highway 290 and US Highway 281. Because of the proximity to two major cities, the highways carry heavy traffic volumes and US 281 in particular was in need of repair.