Skip to main content

Lane Construction to carry out Florida highway deal

Lane Construction Corporation will carry out construction work worth US$134.6 million on a stretch of highway in Florida. This 21km section of the new Suncoast Parkway 2 will run to the north of Tampa, along Florida’s western coast. The route is intended to be a major transport corridor for the state and will feature four lanes. Called SR 589, the tolled route will run from South of SR 700 (US 98) to SR 44 in Hernando and Citrus Counties. Lane Construction is building the second of two sections of the Sunco
November 24, 2017 Read time: 2 mins
2878 Lane Construction Corporation will carry out construction work worth US$134.6 million on a stretch of highway in Florida. This 21km section of the new Suncoast Parkway 2 will run to the north of Tampa, along Florida’s western coast. The route is intended to be a major transport corridor for the state and will feature four lanes. Called SR 589, the tolled route will run from South of SR 700 (US 98) to SR 44 in Hernando and Citrus Counties. Lane Construction is building the second of two sections of the Suncoast Parkway 2, with the firm’s work due to commence in early 2018 and expected to require around 48 months to complete.


Lane Construction is the US subsidiary of Salini Impregilo and its work on the Florida highway project involves building 15 bridges. The work also includes milling and resurfacing, base work, drainage improvements and kerb and gutter construction. Finally Lane will install traffic signals, lighting and signing, as well as new safety guardrail, retaining walls, pedestrian walkways and a multi-use trail. Once the Suncoast Parkway 2 is opent to traffic, drivers can expect shorter commuting times while the new route will also improve sustainability by contributing to the reduction of emissions on the existing network between Citrus County and the Tampa Bay Region.

For more information on companies in this article

Related Content

  • Stantec wins upgrade to Florida SR 91
    July 29, 2019
    Canadian contractor Stantec is to lead design work for a 16km upgrade and widening of State Road 91 in the US state of Florida. Work will turn the section of road through Lake County into price-managed lanes for improved travel reliability, according to the company which will be working for Florida’s Turnpike Enterprise, part of the Florida Department of Transportation. Turnpike Enterprise operates a 740km-system of limited access toll highways Stantec’s design for the project, with a construction cos
  • $337 million NC road deal for Lane
    July 18, 2025
    Lane Construction has won a $337 million road deal for NC.
  • New Atlanta express lanes open
    September 14, 2018
    Drivers in the US city of Atlanta will benefit from reduce congestion and faster journeys with the opening of new reversible toll lanes.
  • Miami interstate highway redesign project commencing
    January 18, 2019
    Planning work is being carried out for a major interstate redesign project in Miami, Florida. The US$802 million project involves the redesign of I-395 and surveying activities are now commencing. The I-395/SR 836/I-95 Project is being carried out in partnership between the Florida Department of Transportation (FDOT) and the Miami-Dade Expressway Authority (MDX). The work will be carried out between State Road (SR) 836 beginning at NW 17 Avenue and continuing through the SR 836/I-395/I-95 (Midtown) Intercha