Skip to main content

Lafarge Cement launches Lafarge Endure SR blend cement

Lafarge Cement – part of Aggregate Industries – has launched Lafarge Endure SR; a high performance, low carbon, CEM II blend cement. While traditional CEM I blends use virgin clinker to produce the finished cement, Lafarge Endure SR blends Portland fly ash (PFA) with clinker, which results in a lower embodied CO2, as well as improved plastic and hardened properties when used in concrete. Another benefit of using Lafarge Endure SR over a CEM I blend is its suitability for all ground types. Sulphates in
June 6, 2019 Read time: 2 mins
Lafarge Endure SR is a high performance, low carbon, CEM II blend cement

3180 Lafarge Cement – part of 2297 Aggregate Industries – has launched Lafarge Endure SR; a high performance, low carbon, CEM II blend cement.

While traditional CEM I blends use virgin clinker to produce the finished cement, Lafarge Endure SR blends Portland fly ash (PFA) with clinker, which results in a lower embodied CO2, as well as improved plastic and hardened properties when used in concrete.

Another benefit of using Lafarge Endure SR over a CEM I blend is its suitability for all ground types. Sulphates in the ground can negatively impact CEM I blends. However, Lafarge Endure SR is resistant to sulphates, allowing contractors and suppliers to scope a wider variety of projects including those that may have previously been hindered by ground type.

Once hardened, Lafarge Endure SR can be used to DC-4 durability standard and can help increase the life of the structure thanks to its resistance to carbonation and chloride and sulphate attack. This makes it ideal for practically any situation, from producing ready-mixed and precast concrete, to marine, grouting and tunnelling applications.

Steve Curley, commercial director at Aggregate Industries, said: “As its name suggests, Lafarge Endure SR is designed to dramatically increase the longevity of the concrete it forms a part of. It is a great solution for contractors that want to reduce the environmental impact of their build while simultaneously improving its life span.

“In addition to its lower embodied CO₂, Lafarge Endure SR uses 10 per cent less water than CEM I to reach workable consistency and offers improve pumpability and mixing efficiency. Each of these benefits adds up to a cement that is truly forward-thinking.”

For more information on companies in this article

Related Content

  • Next-generation materials testing with new technology
    August 17, 2022
    The US’s Balanced Mix Design sets the stage for next-generation performance testing, according to CONTROLS’ Andrea Carlessi
  • Innovative road construction
    February 19, 2024
    Wirtgen is introducing an innovative concept for road construction in the shape of its new WRC 240(i) rock crusher. The machine has been developed from the firm’s proven soil stabiliser technology and is designed to break coarse rocks in-situ, as found in hand-packed pavement layers.
  • High demand for German-made construction machinery
    February 14, 2018
    The German construction equipment industry is in the middle of a boom, according to data from the country’s equipment manufacturing body, the VDMA. A new report highlights that turnover and incoming orders saw a double-digit increase in 2017 and Germany manufacturers are starting 2018 with a high degree of optimism. According to the VDMA figures, the German construction equipment industry ended 2017 with turnover of €10.8 billion– an increase of 15% compared to the previous year. It is the fourth
  • Beijing airport runway features novel asphalt solution
    December 7, 2017
    Beijing ranks amongst the five busiest airports across the globe and its runway surfaces face tough stresses as a result. Over 94 million passengers flew through Beijing Capital Airport (BCA) in 2016 and as many as 70 flights/hour can take off and land during peak times. The 60m-wide middle runway of Beijing Capital International Airport is the busiest of the three runways, with a landing and take-off flight ratio of up to 40%. This runway was first rehabilitated in 1996 and then repaired in 2013 and 2015