Skip to main content

Kuwait Fund loans Sri Lanka US$35m for bridge reconstruction

Kuwait Fund for Arab Economic Development has awarded a loan worth nearly US$35 million to the Sri Lankan government for reconstructing 25 deteriorated road bridges. The bridges include three in Southern Province, four in Sabaragamuwa Province, nine in Western Province, three in Northern Province, five in North Western Province and a bridge in Eastern Province. The loan comes after the Ministry of Highways, Ports and Shipping sent out an invitation to bid in October, covering eight bridges along the
December 11, 2014 Read time: 2 mins
1006 Kuwait Fund for Arab Economic Development has awarded a loan worth nearly US$35 million to the Sri Lankan government for reconstructing 25 deteriorated road bridges.

The bridges include three in Southern Province, four in Sabaragamuwa Province, nine in Western Province, three in Northern Province, five in North Western Province and a bridge in Eastern Province.

The loan comes after the Ministry of Highways, Ports and Shipping sent out an invitation to bid in October, covering eight bridges along the national road network in the Northern Province. Two of bridges will be on the A009 Kandy to Jaffna road.

3260 World Highways %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 14590 0 oLinkExternal reported in October last year Visit &quot;New bridge project for Sri Lanka&quot; Page false /categories/road-highway-structures/news/new-bridge-project-for-sri-lanka/ false false%> that a bridge costing around $321 million will be built across the Kelani River. The 415m bridge is expected to take three years to construct and is being funded by the 2416 Japan International Cooperation Agency, which is also funding the design and feasibility studies. The 145km river flows from the Sri Pada Mountain Range to the capital city Colombo, where it supplies around 80% of water for the inhabitants.

Related Content

  • World debut for Ruthmann’s T 720 truck-mounted platform
    January 6, 2017
    The newest addition to Ruthmann’s Height series offers flexible access in awkward situations thanks to its extended telescoping upper boom with moveable jib. Ruthmann’s Steiger T 720 truck-mounted access platform made its world debut at bauma. The model has a working height of up to 72m and maximum lateral reach of 38m. Its design means that operators still have 21.4m reach at their disposal at a working height of 68m and with a 100kg cage load.
  • World debut for Ruthmann’s T 720 truck-mounted platform
    April 17, 2013
    The newest addition to Ruthmann’s Height series offers flexible access in awkward situations thanks to its extended telescoping upper boom with moveable jib. Ruthmann’s Steiger T 720 truck-mounted access platform made its world debut at bauma. The model has a working height of up to 72m and maximum lateral reach of 38m. Its design means that operators still have 21.4m reach at their disposal at a working height of 68m and with a 100kg cage load.
  • Turkey’s Bosporus bridge opening
    August 25, 2016
    Turkey’s Yavuz Sultan Selim Bridge over the Bosporus is having its official opening, which is being carried out by senior members of the country’s government including president Recep Erdoğan. The final sections of the deck structure were put into place in March 2016 and the project, which commenced in 2013, has been completed in record time. This is the third bridge to span the Bosporus at Turkey’s commercial centre, Istanbul and the new crossing will form part of the country’s North Marmara Highway pro
  • Matest Asphalt Splitter will make life easier for lab technicians
    January 6, 2017
    Materials testing firm Matest has launched an asphalt splitter at bauma. The machine breaks up asphalt specimens so that the constituent parts can be tested, a task that is often carried out by hand. “The purpose of the machine is to make the operator’s life easier,” said area manager Massiono Martorini. The splitter should also lead to greater efficiency, as breaking specimens down will take less time, and allow laboratory technicians to do other things. Matest expects to sell the splitter to laboratories