Skip to main content

Kuwait Fund loans Sri Lanka US$35m for bridge reconstruction

Kuwait Fund for Arab Economic Development has awarded a loan worth nearly US$35 million to the Sri Lankan government for reconstructing 25 deteriorated road bridges. The bridges include three in Southern Province, four in Sabaragamuwa Province, nine in Western Province, three in Northern Province, five in North Western Province and a bridge in Eastern Province. The loan comes after the Ministry of Highways, Ports and Shipping sent out an invitation to bid in October, covering eight bridges along the
December 11, 2014 Read time: 2 mins
1006 Kuwait Fund for Arab Economic Development has awarded a loan worth nearly US$35 million to the Sri Lankan government for reconstructing 25 deteriorated road bridges.

The bridges include three in Southern Province, four in Sabaragamuwa Province, nine in Western Province, three in Northern Province, five in North Western Province and a bridge in Eastern Province.

The loan comes after the Ministry of Highways, Ports and Shipping sent out an invitation to bid in October, covering eight bridges along the national road network in the Northern Province. Two of bridges will be on the A009 Kandy to Jaffna road.

3260 World Highways %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 14590 0 oLinkExternal reported in October last year Visit &quot;New bridge project for Sri Lanka&quot; Page false /categories/road-highway-structures/news/new-bridge-project-for-sri-lanka/ false false%> that a bridge costing around $321 million will be built across the Kelani River. The 415m bridge is expected to take three years to construct and is being funded by the 2416 Japan International Cooperation Agency, which is also funding the design and feasibility studies. The 145km river flows from the Sri Pada Mountain Range to the capital city Colombo, where it supplies around 80% of water for the inhabitants.

Related Content

  • Improved access technology from Ruthmann
    January 6, 2017
    From German firm Ruthmann comes the new Steiger T 7XX unit, which broadens its height performance access equipment series. Featuring sturdy construction, the unit is said to be both robust and durable with fine-grained steel used to maximise the performance of its telescoping boom. The design is weight-optimised, due to high-strength steel being used during fabrication. Lateral reach and working height capacities have been increased and even under heavy loads, the platform is said to be sturdy and stable. T
  • Improved access technology from Ruthmann
    January 31, 2013
    From German firm Ruthmann comes the new Steiger T 7XX unit, which broadens its height performance access equipment series. Featuring sturdy construction, the unit is said to be both robust and durable with fine-grained steel used to maximise the performance of its telescoping boom. The design is weight-optimised, due to high-strength steel being used during fabrication. Lateral reach and working height capacities have been increased and even under heavy loads, the platform is said to be sturdy and stable. T
  • TRIMM conference in Brussels
    September 22, 2014
    Tomorrow's Road and Infrastructure Monitoring and Management (TRIMM) conference is being held in Brussels on October 23rd-24th 2014. The TRIMM event will be located at the Diamant Centre in Brussels, Belgium. This meeting is being organised in conjunction with the European Road Profile User's Group (ERPUG), which has objectives that fit with the TRIMM project. The event will be composed of a mix of presentations from TRIMM and ERPUG. ERPUG will also organise an exhibition and a get-together event includ
  • Slovakian bridge defies high explosives demolition attempt
    November 15, 2012
    An incomplete bridge in Slovakia surprisingly defied an attempt to bring it down with high explosives, officially authorised after the death of four workers in an accident during its construction. The attempt to blast off the part of the under construction D1 highway bridge between the villages of Iliašovce and Kurimany (Prešov region) was made on Tuesday, November 13, 11 days after the tragic incident which also resulted in injuries to a number of other workers.