Skip to main content

Kuwait Fund loans Sri Lanka US$35m for bridge reconstruction

Kuwait Fund for Arab Economic Development has awarded a loan worth nearly US$35 million to the Sri Lankan government for reconstructing 25 deteriorated road bridges. The bridges include three in Southern Province, four in Sabaragamuwa Province, nine in Western Province, three in Northern Province, five in North Western Province and a bridge in Eastern Province. The loan comes after the Ministry of Highways, Ports and Shipping sent out an invitation to bid in October, covering eight bridges along the
December 11, 2014 Read time: 2 mins
1006 Kuwait Fund for Arab Economic Development has awarded a loan worth nearly US$35 million to the Sri Lankan government for reconstructing 25 deteriorated road bridges.

The bridges include three in Southern Province, four in Sabaragamuwa Province, nine in Western Province, three in Northern Province, five in North Western Province and a bridge in Eastern Province.

The loan comes after the Ministry of Highways, Ports and Shipping sent out an invitation to bid in October, covering eight bridges along the national road network in the Northern Province. Two of bridges will be on the A009 Kandy to Jaffna road.

3260 World Highways %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 14590 0 oLinkExternal reported in October last year Visit &quot;New bridge project for Sri Lanka&quot; Page false /categories/road-highway-structures/news/new-bridge-project-for-sri-lanka/ false false%> that a bridge costing around $321 million will be built across the Kelani River. The 415m bridge is expected to take three years to construct and is being funded by the 2416 Japan International Cooperation Agency, which is also funding the design and feasibility studies. The 145km river flows from the Sri Pada Mountain Range to the capital city Colombo, where it supplies around 80% of water for the inhabitants.

Related Content

  • Bridge deck launched for the New Wear Crossing, Sunderland (Video)
    March 30, 2017

    The 300m bridge deck of Sunderland’s New Wear Crossing has been successfully launched across the river.

    The 4,750tonne concrete and steel deck was resting on the south side of the River Wear from where it was inched across to touch the north side in a 20-hour operation. It had to slide through the twin arched towers of the bridge’s double pylon on its way to its final position to connect the city regions of Pallion to the south and Castletown to the north.

  • Consortia line up for Denmark’s Storstrom Bridge project
    February 12, 2015
    Samsung, Daewoo, Hyundai, Acciona, Ed Züblin, MT Højgaard and Per Aarsleff are among the bidders to build a bridge connecting the Danish islands of Zealand and Falstser. The Danish Road Directorate expects to choose five pre-qualified consortia for the Storstrom Bridge project in May and the bids for the project are scheduled to be submitted by April 2016. The new bridge, likely to cost around €565 million including the cost of demolishing the old bridge it will replace, is expected to open by 2021, a
  • VIDEO: Life in the deteriorating lane – Pennsylvania Turnpike
    October 17, 2016
    Nothing lasts forever, including – and perhaps especially – highways. One fine example of this is a 21km section of the original 580km Pennsylvania Turnpike in the US state of Pennsylvania.

    As the video shows, vegetation, animals and cyclists have slowly been reclaiming part of what was hailed as an engineering masterpiece when it was opened in 1940.
  • VIDEO footage shows bridge replacement project in Rhode Island
    October 10, 2014
    A time-lapse video has been released showing the rapid replacement of the Barton Corner Bridge in Rhode Island in the US. Rhode Island Department of Transportation (RIDOT) partnered with EarthCam to document the US$6.4 million rapid replacement of the Barton Corner Bridge. The construction project was completed during an 11-day period in August 2014 and can be seen in an exclusive time-lapse, released by RIDOT. Had RIDOT had used conventional methods, the bridge replacement would have taken two full constru