Skip to main content

Kuwait construction project for Italian contractor

An Italian contractor is to carry out work on Kuwait’s Abdaly Highway. The project is worth nearly US$300 million and will link Kuwait City with Abdaly. The work will be carried out by Itinera, a subsidiary of Gavio. The project calls for upgrading and widening of the highway, which has three lanes in either direction at present. Following the rebuilding work the highway will feature five lanes in either direction, as well as emergency lanes.
May 19, 2017 Read time: 1 min

An Italian contractor is to carry out work on Kuwait’s Abdaly Highway. The project is worth nearly US$300 million and will link Kuwait City with Abdaly. The work will be carried out by Itinera, a subsidiary of Gavio. The project calls for upgrading and widening of the highway, which has three lanes in either direction at present. Following the rebuilding work the highway will feature five lanes in either direction, as well as emergency lanes.

Related Content

  • Nepal road improvement project starts
    March 28, 2019
    Work is now underway on a major road improvement project in central Nepal. The Chinese contractor, China Construction Seventh Engineering Division (CSSED), is carrying out the upgrade of the East-West Highway route linking Narayagadh and Butwal. The 131km road improvement project is worth US$142.9 million and is expected to be ready by the end of 2022. The project will boost capacity and safety for drivers on the route by widening the road so that it has two lanes in either direction, rather than just one l
  • Texas road improvement works for Webber
    August 4, 2022
    Road improvement works have been awarded to Webber in Texas.
  • Major bridge rebuild project in India
    June 27, 2016
    A major rebuilding project is now planned for a key link in India. The work will be carried out on the Mahatma Gandhi Setu Bridge, which spans the famous River Ganges. Measuring nearly 5.6km, this is the longest river crossing in India and had its official inauguration in 1982. The bridge links Patna in the south to Hajipur in the north of Bihar and features a 7.5m wide deck while lying on 45 supports in all. The repair work is expected to cost close to US$260 million and was approved by India’s Cabinet
  • Kuwait’s Sheikh Jaber al-Ahmad Al-Sabah Causeway opens
    August 27, 2019
    World Highways revisits the world’s fourth longest sea bridge - four years to construct and which has slashed travel time between Kuwait’s largest island and the capital city