Skip to main content

Kuwait causeway connection construction complete

Kuwait’s innovative Sheikh Jaber Al-Ahmad Al-Sabah Causeway connection is now complete and open to traffic. Measuring 48.5km in all, the new causeway comprises the 36.1km Subiyah Link and the 12.4km Doha Link, making this the world’s fourth longest bridge. Dar’s worked as lead consultant on the project working alongside Dar Group sister companies TY Lin International, Ross & Baruzzini and Currie & Brown. Dar was the Engineer’s Representative and the construction supervisor, as well as leading detailed desi
May 20, 2019 Read time: 2 mins
Kuwait’s novel causeway project is both innovative and effective

Kuwait’s innovative Sheikh Jaber Al-Ahmad Al-Sabah Causeway connection is now complete and open to traffic. Measuring 48.5km in all, the new causeway comprises the 36.1km Subiyah Link and the 12.4km Doha Link, making this the world’s fourth longest bridge.

Dar’s worked as lead consultant on the project working alongside Dar Group sister companies 3355 TY Lin International, Ross & Baruzzini and Currie & Brown. Dar was the Engineer’s Representative and the construction supervisor, as well as leading detailed design review on transportation, GIS, environmental, geotechnical and marine works.

Dar’s brief from for Kuwait’s Public Authority for Roads & Transportation (PART) was to ensure a 100-year service life in a challenging coastal marine environment.

The Causeway facilitates development of the border region of Subiyah, which will be the site of a major free-trade zone, Madinat al-Hareer or Silk City, reviving Kuwait’s place on the ancient Silk Route. Land areas of 350,000m2 and 600,000m2 have been reclaimed at either end of the Causeway, while two artificial islands of 300,000m2 each have been constructed along its length.

The Causeway carries dual carriageways, each with a total width of 17m and carrying three lanes of traffic, an emergency lane and a hard shoulder. The main section reduces the journey time from Kuwait City to Subiyah from 70 minutes to 20 minutes. The subsidiary link to Doha (Kuwait) and the Kuwait Entertainment City reduces journey times from 30 minutes to 7 minutes.

A cable-stayed bridge in the main section creates a navigation channel 120m wide and 23m high to enable access to Kuwait’s Doha port. This opening in the Causeway is supported by a 151m-high pylon, inspired in its shape by a traditional sailboat, but unconventional in its engineering.

For more information on companies in this article

Related Content

  • New bridges, ramp and tunnel for Dubai
    February 19, 2020
    New flyover bridges, a ramp and a tunnel connection are being built in Dubai.
  • A new East Africa toll road linking Zambia and Tanzania
    October 30, 2023
    A new East Africa toll road is under construction to link Zambia with Tanzania.
  • Formwork plays a leading role in global infrastructure projects
    June 13, 2012
    New and highly regarded existing formwork systems have been used in major recent transport-related construction projects across the globe. Guy Woodford looks at some of their applications The multi-million dollar Mississippi River Bridge project in the United State is creating a vital new gateway between Illinois and Missouri. Central to the project is the realignment and reconstruction of Interstate 70 and a new landmark bridge, featuring two pylons projecting vertically from the Mississippi river bed w
  • New barriers are helping improve road safety
    June 30, 2014
    A series of new guardrail technologies and barrier developments are now coming to market - Mike Woof writes. An array of technical developments is helping improve highway safety for road users. New barrier and guardrail technologies can offer greater conspicuity so as to alert drivers, along with better restraint capabilities. Gregory Industries offers a wide range of steel and cable barrier types and has now developed an attachment system for international use. This fixes the guardrail to the post and in t