Skip to main content

Kuwait causeway connection construction complete

Kuwait’s innovative Sheikh Jaber Al-Ahmad Al-Sabah Causeway connection is now complete and open to traffic. Measuring 48.5km in all, the new causeway comprises the 36.1km Subiyah Link and the 12.4km Doha Link, making this the world’s fourth longest bridge. Dar’s worked as lead consultant on the project working alongside Dar Group sister companies TY Lin International, Ross & Baruzzini and Currie & Brown. Dar was the Engineer’s Representative and the construction supervisor, as well as leading detailed desi
May 20, 2019 Read time: 2 mins
Kuwait’s novel causeway project is both innovative and effective

Kuwait’s innovative Sheikh Jaber Al-Ahmad Al-Sabah Causeway connection is now complete and open to traffic. Measuring 48.5km in all, the new causeway comprises the 36.1km Subiyah Link and the 12.4km Doha Link, making this the world’s fourth longest bridge.

Dar’s worked as lead consultant on the project working alongside Dar Group sister companies 3355 TY Lin International, Ross & Baruzzini and Currie & Brown. Dar was the Engineer’s Representative and the construction supervisor, as well as leading detailed design review on transportation, GIS, environmental, geotechnical and marine works.

Dar’s brief from for Kuwait’s Public Authority for Roads & Transportation (PART) was to ensure a 100-year service life in a challenging coastal marine environment.

The Causeway facilitates development of the border region of Subiyah, which will be the site of a major free-trade zone, Madinat al-Hareer or Silk City, reviving Kuwait’s place on the ancient Silk Route. Land areas of 350,000m2 and 600,000m2 have been reclaimed at either end of the Causeway, while two artificial islands of 300,000m2 each have been constructed along its length.

The Causeway carries dual carriageways, each with a total width of 17m and carrying three lanes of traffic, an emergency lane and a hard shoulder. The main section reduces the journey time from Kuwait City to Subiyah from 70 minutes to 20 minutes. The subsidiary link to Doha (Kuwait) and the Kuwait Entertainment City reduces journey times from 30 minutes to 7 minutes.

A cable-stayed bridge in the main section creates a navigation channel 120m wide and 23m high to enable access to Kuwait’s Doha port. This opening in the Causeway is supported by a 151m-high pylon, inspired in its shape by a traditional sailboat, but unconventional in its engineering.

For more information on companies in this article

Related Content

  • New bridge over Nile will help landlocked Uganda
    April 3, 2013
    A new River Nile bridge is essential to boost trade and improve traffic in landlocked Uganda. Shem Oirere reports A new bridge across the River Nile at Jinja, to be constructed by Uganda, is promising to boost trade in eastern Africa and pave the way for smooth and safe traffic in and out of this landlocked country. The bridge, also known as the Second Nile Bridge, is the first cable-stayed bridge in the region and will be constructed at Njeru, 80km east of the Ugandan capital Kampala, along the Kampala-Jin
  • Controversial Russian bridge opens
    May 16, 2018
    The first stage of a controversial Russian bridge project is now complete, with the link opening to use by cars. The Kerch Strait bridge spans the Black Sea, connecting Russia’s Taman Peninsula in Krasnodar with Crimea, the latter having been controversially annexed by Russia from Ukraine in 2014. The official opening of the 19km-long bridge was carried out by Russia’s president, Vladimir Putin, who drove across the link in a Kamaz truck to reach the city of Kerch. The US$2.7 billion bridge forms part of
  • Progress delayed on Kenya's vital highway link
    February 16, 2012
    Kenya is investing in road developments , reports Shem Oirere. A multi-million dollar highway expansion project in Kenya's capital Nairobi may now be delayed for close to a year because of a huge underground network of water, electricity and communication pipes and cables that has slowed down construction works.
  • The bridge to reduced traffic
    February 28, 2012
    In Zaporozhye, the industrial metropolis in Ukraine's south-east, a multi-lane cable stayed bridge is being built alongside an older viaduct. On completion, this large-scale infrastructure project will massively reduce the traffic burden on the existing bridge and significantly improve the daily traffic situation at this major river crossing.