Skip to main content

Kuwait causeway connection construction complete

Kuwait’s innovative Sheikh Jaber Al-Ahmad Al-Sabah Causeway connection is now complete and open to traffic. Measuring 48.5km in all, the new causeway comprises the 36.1km Subiyah Link and the 12.4km Doha Link, making this the world’s fourth longest bridge. Dar’s worked as lead consultant on the project working alongside Dar Group sister companies TY Lin International, Ross & Baruzzini and Currie & Brown. Dar was the Engineer’s Representative and the construction supervisor, as well as leading detailed desi
May 20, 2019 Read time: 2 mins
Kuwait’s novel causeway project is both innovative and effective

Kuwait’s innovative Sheikh Jaber Al-Ahmad Al-Sabah Causeway connection is now complete and open to traffic. Measuring 48.5km in all, the new causeway comprises the 36.1km Subiyah Link and the 12.4km Doha Link, making this the world’s fourth longest bridge.

Dar’s worked as lead consultant on the project working alongside Dar Group sister companies 3355 TY Lin International, Ross & Baruzzini and Currie & Brown. Dar was the Engineer’s Representative and the construction supervisor, as well as leading detailed design review on transportation, GIS, environmental, geotechnical and marine works.

Dar’s brief from for Kuwait’s Public Authority for Roads & Transportation (PART) was to ensure a 100-year service life in a challenging coastal marine environment.

The Causeway facilitates development of the border region of Subiyah, which will be the site of a major free-trade zone, Madinat al-Hareer or Silk City, reviving Kuwait’s place on the ancient Silk Route. Land areas of 350,000m2 and 600,000m2 have been reclaimed at either end of the Causeway, while two artificial islands of 300,000m2 each have been constructed along its length.

The Causeway carries dual carriageways, each with a total width of 17m and carrying three lanes of traffic, an emergency lane and a hard shoulder. The main section reduces the journey time from Kuwait City to Subiyah from 70 minutes to 20 minutes. The subsidiary link to Doha (Kuwait) and the Kuwait Entertainment City reduces journey times from 30 minutes to 7 minutes.

A cable-stayed bridge in the main section creates a navigation channel 120m wide and 23m high to enable access to Kuwait’s Doha port. This opening in the Causeway is supported by a 151m-high pylon, inspired in its shape by a traditional sailboat, but unconventional in its engineering.

For more information on companies in this article

Related Content

  • Nigeria’s giant city Lagos to benefit from a new cable-stayed bridge
    September 19, 2012
    The first cable-stayed bridge in Nigeria will link two districts of the megacity of Lagos Nigeria’s first cable-stayed bridge, the Lekki Ikoyi Bridge in the megacity of Lagos is scheduled for completion at the end of 2012. Its striking 90m high pylon characterises the appearance of the 1,357m long bridge, which will connect two districts of the West African city, Lekki on the Lekki Peninsula and Ikoyi on Lagos Island.
  • Arch of innovation
    September 21, 2020
    ULMA engineering solutions on the emblematic Arch of Innovation bridge, Brazil
  • G&Z pave the way as East meets West
    March 28, 2014
    The Silk Route is one of the oldest trading links between Europe and Asia and is being upgraded with some of the newest equipment. The nation of Georgia is located on what is known as the ‘crossroads’ between Western Asia and Eastern Europe. It lies to the east of the Black Sea and is on one of the shortest routes between western China and Europe. Since the Middle Ages this strategically important country has played host to one of the network of roads collectively known as the Silk Route. For much of the 20
  • VIDEO: Sarens raises the pylon for New Wear Crossing in Sunderland
    February 13, 2017
    It was as weekend working in Sunderland city, northeast England, for global lifting specialist 8569 Sarens.

    Over the two days, the Belgian company gently raised a 1,550tonne steel pylon that will form the backbone of the New Wear Crossing – no official name yet – across the River Wear.

    General work on the two-span cable-stay bridge started on the bridge in May 2015. The structure will be supported by the single double pylon and will have four vehicle lanes, as well as dedicated cycle and pedestrian routes.