Skip to main content

Kuwait bridge construction underway

Kuwait’s key construction contract, to build the Subbiya Bridge project, is proceeding on track. The project is now 73% complete. The contract is a major one for Kuwait as it involves the construction of the 36km long Sheikh Jaber Al Ahmad Al Sabah Causeway. The work is likely to meet it construction schedule in 2018. The causeway project is also known as The Subbiya Bridge. The work is being handled by a consortium comprising local firm Combined Group Contracting Company, and South Korean company Hyundai E
March 11, 2017 Read time: 1 min
Kuwait’s key construction contract, to build the Subbiya Bridge project, is proceeding on track. The project is now 73% complete. The contract is a major one for Kuwait as it involves the construction of the 36km long Sheikh Jaber Al Ahmad Al Sabah Causeway. The work is likely to meet it construction schedule in 2018. The causeway project is also known as The Subbiya Bridge. The work is being handled by a consortium comprising local firm 6926 Combined Group Contracting Company, and South Korean company 5739 Hyundai Engineering. When the project is complete the US$3 billion causeway will cut the journey time between Kuwait City and Subbiya from 90 minutes at present to around 20 minutes.

For more information on companies in this article

Related Content

  • Bulgaria breaks ground for Martisa River bridge
    August 23, 2023
    The contract was awarded to local engineering firm GBS-Infrastructure Construction in Plovdiv, a subsidiary of the Bulgarian civil engineering group Glavbolgarstroy.
  • Bentley Systems awards winners announced
    October 19, 2018
    The winners in the Bentley Systems awards for excellence in infrastructure have been announced. Final judging took place at the Bentley Year in Infrastructure 2018 conference, held in London. Meeting earlier in the week at the London Hilton Metropole Hotel where the event was held, panels of expert judges selected the winners, having previously pre-selected three projects as key contenders. In the roads category, the Pan Borneo Highway in Malaysia’s Sarawak Region beat tough competition to win over the I-5
  • Turkish trans-continental tunnel to tie Asia and Europe
    April 22, 2014
    Excavation work is in hand for the Eurasia Tunnel in Turkey. South Korean contractor SK Engineering and Construction (SK E&C) is carrying out the excavation work as part of a BOT contract. The project is costing some US$1.24 billion and the 5.4km tunnel will provide a new trans-continental connection between the towns of Goztepe and Kazlicesme when it opens in 2017. Running below the Bosporus Strait, the tunnel is expected to reduce the travel time to 15 minutes from the current 100 minutes. The Eurasia Tun
  • Bridge design using flow modelling techniques
    February 17, 2012
    SBG has set numerous engineering precedents with its hugely innovative Jamarat Bridge project in Saudi Arabia