Skip to main content

Krasnodar bypass project being planned

A new bypass project is being planned for Krasnodar in Russia. Building work for the Krasnodar’s North-West Bypass is expected to commence in 2018. The 57km bypass project includes building two overpasses and seven interchanges. Construction of this new bypass will join the M4 Don highway with the Yeyskoye Highway and the Krasnodar-Temryuk-Bely route. The project is costing US$430.6 million and forms part of a wider plan to improve connectivity around the Black Sea.
July 18, 2017 Read time: 1 min

A new bypass project is being planned for Krasnodar in Russia. Building work for the Krasnodar’s North-West Bypass is expected to commence in 2018. The 57km bypass project includes building two overpasses and seven interchanges. Construction of this new bypass will join the M4 Don highway with the Yeyskoye Highway and the Krasnodar-Temryuk-Bely route. The project is costing US$430.6 million and forms part of a wider plan to improve connectivity around the Black Sea.

Related Content

  • Ufa highway project to start in 2018
    November 2, 2017
    Construction on a new eastern highway connection to the city of Ufa should commence in 2018. The new link will connect the city, the capital of Bashkortostan which forms part of the Russian Federation, to the M-5 Ural Highway. The project is expected to cost US$694 million to construct and the work will be headed by the Turkish contractor Limak. The project was awarded as a 25 year concession package. Construction will not be without its technical challenges as the route passes through areas that are
  • New Chinese expressway under construction
    January 12, 2022
    A new Chinese expressway project is under construction.
  • Russian cities to benefit from bypasses
    November 21, 2019
    Russia is drawing up plans for bypasses around eight important cities. The construction work will commence in 2020. The cities are Nizhny Novgorod, Naberezhnye Chelny (both Volga), Ryazan, Ivanovo (both Central FD), Volgograd (South), Khasavyurt, Derbent, Vladikavkaz (all in North Caucasus). Some work has already been carried out for the Nizhny Novgorod bypass and the fourth phase of this particular project is expected to cost up to US$353 million.
  • Design contract awarded for Indian bridge project
    March 26, 2018
    A major design contract has been awarded for a key bridge project in India. Consulting engineer COWI has been awarded the contract for the detailed design of the 10.3km Package 1 section of the new link. Meanwhile the Danish consultant Rambøll is to carry out work on the design for the 7.8km Package 2 section of the Mumbai Trans Harbour Link (MTHL). The Owner for MTHL is Mumbai Metropolitan Region Development Authority (MMRDA) The 22km link will be India's longest sea bridge and is expected to cost around