Skip to main content

Komarno bridge on schedule despite cost and environmental protests

Slovakia’s transport minister said he will do everything possible to finish on time a new bridge connecting Komano with the Hungarian town of Komarom. Construction started last year on the €117 million bridge over the Danube River between the Hungarian town of Komarom and the Slovak town of Komarno. Around 85% of the cost of the bridge - designed by Hungarian engineering firm Pont-Terv - will be covered by European Union’s Connecting Europe Facility. Completion is planned for winter 2019. Transport m
July 13, 2018 Read time: 2 mins
You say Komarno, I say Komarom: let’s not call the whole bridge off (photo courtesy Pont-Terv engineering)
Slovakia’s transport minister said he will do everything possible to finish on time a new bridge connecting Komano with the Hungarian town of Komarom.

Construction started last year on the €117 million bridge over the Danube River between the Hungarian town of Komarom and the Slovak town of Komarno.

Around 85% of the cost of the bridge - designed by Hungarian engineering firm Pont-Terv - will be covered by 1116 European Union’s Connecting Europe Facility. Completion is planned for winter 2019.

Transport minister Árpád Érsek made his comments during a recent on-site inspection of the cable stayed bridge and amid protestors concerned over the project’s costs as well environmental concerns about the planned bypass around Komarno.
 
The new bridge was rejected by local residents in their petition during planning, according to local media.

It was announced in mid-2016 that the Hungarian companies Hidepito and Meszaros es Meszaros had won the tender for the 600m bridge but with a price tag of just over €91 million, according to Hungarian media. It was also reported at the time that the project had suffered several delays because of changes to procurement rules in Hungary.

Hungary’s National Infrastructure Development Company (NIF) issued and awarded the tender. The new bridge will be around 200m from the steel Elizabeth Bridge.

In March last year, the 2465 European Commission approved around €100 million towards the estimated €117 million for the project. Hungary will get €52.5 million and Slovakia will receive €47.6 million under the EU's Connecting Europe Facility.

The two cities, although divided by the Danube, have at times been one city under various central European kingdoms.

Komárno is Slovakia's principal port on the Danube. It is also the centre of the Hungarian community in Slovakia, which makes up around 60% of the town's population.

Hungary’s Komárom and Slovakia’s Komárno are also connected by a more recently built so-called lifting bridge.

For more information on companies in this article

Related Content

  • Construction to start on Hungary’s revamped M4 project in 2016
    July 7, 2015
    The Hungarian government has announced that it will restart work on a new section of the M4 dual carriageway between Albertirsa and Ullo in 2016. Hungarian media reported that the government will invest around €192 million and no funding will come from the European Union, of which the country is a member. The two towns are around 25.5km apart, with Albertirsa closest to the capital Budapest at around 60km. The project should be finished some time in 2019, according to Hungarian media. The announcem
  • Bratislava bypass and Karpaty tunnel completion set for 2030
    June 18, 2018
    Slovakia’s national motorway company NDS expects that the Bratislava bypass on the D4 motorway together with the Karpaty tunnel will be completed around 2030. The D4 motorway is part of the trans-European transport network and will connect with the planned R7 expressway linking western and eastern Slovakia, and the existing D1 and D2 motorways”. Apart from construction works on part of the D4 motorway, another two stretches are planned on this link, including the 3.6km stretch from Devinska Nova Ves t
  • Bratislava bypass and Karpaty tunnel completion set for 2030
    June 18, 2018
    Slovakia’s national motorway company NDS expects that the Bratislava bypass on the D4 motorway together with the Karpaty tunnel will be completed around 2030. The D4 motorway is part of the trans-European transport network and will connect with the planned R7 expressway linking western and eastern Slovakia, and the existing D1 and D2 motorways”. Apart from construction works on part of the D4 motorway, another two stretches are planned on this link, including the 3.6km stretch from Devinska Nova Ves t
  • Seven bids submitted for Croatia’s Peljeski bridge access roads
    June 18, 2018
    Croatia’s construction company Integral Inzinjering has submitted the lowest bid of €43 million for construction of access roads for the Peljeski bridge project. Croatian daily newspaper Vecernji List reported that seven bidsd were submitted for the 12.4km project. Highest bid of €88 million has come from China Road and Bridge Corporation, which has the contract to build the bridge. Austria's Strabag offered €65 million. Other bidders were France's Colas, Croatia's GP Krk in cooperation with the Bosni