Skip to main content

Komarno bridge on schedule despite cost and environmental protests

Slovakia’s transport minister said he will do everything possible to finish on time a new bridge connecting Komano with the Hungarian town of Komarom. Construction started last year on the €117 million bridge over the Danube River between the Hungarian town of Komarom and the Slovak town of Komarno. Around 85% of the cost of the bridge - designed by Hungarian engineering firm Pont-Terv - will be covered by European Union’s Connecting Europe Facility. Completion is planned for winter 2019. Transport m
July 13, 2018 Read time: 2 mins
You say Komarno, I say Komarom: let’s not call the whole bridge off (photo courtesy Pont-Terv engineering)
Slovakia’s transport minister said he will do everything possible to finish on time a new bridge connecting Komano with the Hungarian town of Komarom.

Construction started last year on the €117 million bridge over the Danube River between the Hungarian town of Komarom and the Slovak town of Komarno.

Around 85% of the cost of the bridge - designed by Hungarian engineering firm Pont-Terv - will be covered by 1116 European Union’s Connecting Europe Facility. Completion is planned for winter 2019.

Transport minister Árpád Érsek made his comments during a recent on-site inspection of the cable stayed bridge and amid protestors concerned over the project’s costs as well environmental concerns about the planned bypass around Komarno.
 
The new bridge was rejected by local residents in their petition during planning, according to local media.

It was announced in mid-2016 that the Hungarian companies Hidepito and Meszaros es Meszaros had won the tender for the 600m bridge but with a price tag of just over €91 million, according to Hungarian media. It was also reported at the time that the project had suffered several delays because of changes to procurement rules in Hungary.

Hungary’s National Infrastructure Development Company (NIF) issued and awarded the tender. The new bridge will be around 200m from the steel Elizabeth Bridge.

In March last year, the 2465 European Commission approved around €100 million towards the estimated €117 million for the project. Hungary will get €52.5 million and Slovakia will receive €47.6 million under the EU's Connecting Europe Facility.

The two cities, although divided by the Danube, have at times been one city under various central European kingdoms.

Komárno is Slovakia's principal port on the Danube. It is also the centre of the Hungarian community in Slovakia, which makes up around 60% of the town's population.

Hungary’s Komárom and Slovakia’s Komárno are also connected by a more recently built so-called lifting bridge.

For more information on companies in this article

Related Content

  • Consortium to build another Dunajec River crossing near Nowy Sacz
    June 14, 2019
    A Polish-Hungarian consortium has signed a €44 million contract to construct a bridge over the Dunajec River near the southern Polish town of Nowy Sacz. Przedsiebiorstwo Wielobranzowe Banimex, from Poland, and Hungarian contractor Hodmezovasarhelyi Utepito Korlatolt Felelossegu will build the bridge within 25 months, according to Polish media reports. Nowy Sącz is at the confluence of the Kamienica and Dunajec rivers , about 20km north of the border with Slovakia and in the Sądecka Valley.
  • Albania prequalifying for bypasses around Vlore and Fier
    October 5, 2017
    Albania is pre-qualifying contractors for two major bypass projects, according to the European Bank for Reconstruction and Development. One is for construction of a 29km bypass of the southern Adriatic port city of Vlore with work expected to take 27 months. Vlore, with a population or around 130,000, is the country’s third largest city.
  • TISPOL European speeding crackdown nets 120,000 tickets in 24 hours (Video)
    April 28, 2015
    The first pan-European 24-hour speeding enforcement crackdown resulted in police issuing more than 120,000 penalties. TISPOL, the European Traffic Police Network based in London, UK, said the “marathon” took place earlier this month and so far 17 out of 22 participating countries have provided data. A total of 4,352,234 vehicles were checked during the 24 hours. Of the 122,581 speeding offences, 116,479 were detected by police officers, with 6,102 detections using automatic devices. Police in Germa
  • Polaqua signs S6 dual carriageway deal and Tri-City contract
    April 9, 2018
    Polish contractor Polaqua has signed a deal worth €193 million to design and build a 20km section of S6 dual carriageway. Completion is scheduled for mid-2021. Polaqua will also build a 3km section as part of the expansion of the ring road around the Tri-City area in northern Poland. Tri-City incorporates the three cities in Pomerania - Gdańsk, Gdynia and Sopot, as well as surrounding minor towns. They are situated along the coast of Gdańsk Bay on the Baltic Sea. The regional population is more than 1