Skip to main content

Kier rebuilds storm-damaged road in England’s tourist Cumbria region

The first of 20 steel posts have been positioned for major road repairs to the A591 road in northern England under a £40 million project to repair December storm damage. The A591 is a major local authority road in Cumbria. It links the M6 motorway near Brettargh Holt with important Lake District tourist destinations such as Kendal, Windermere, Ambleside, Grasmere and Keswick.
May 10, 2016 Read time: 2 mins
Improvements are being made to the A591 in Cumbria

The first of 20 steel posts have been positioned for major road repairs to the A591 road in northern England under a £40 million project to repair December storm damage.

The A591 is a major local authority road in Cumbria. It links the M6 motorway near Brettargh Holt with important Lake District tourist destinations such as Kendal, Windermere, Ambleside, Grasmere and Keswick.

The restoration project is being led by 8100 Highways England, the wholly government-owned road infrastructure agency, on behalf of Cumbria County Council and the road is schedule to be reopened by the end of May.

Last month, Kier Highways was appointed as main contractor for the re-build work on the A591 at Dunmail Raise, which was washed away. Posts are being fastened to the bedrock at the site and will be used to build a retaining wall in the beck at the side of the collapsed part of the A591.
 
Chris Holehouse, Highways England’s senior project manager for the scheme, said that the retaining wall is already starting to take shape. It wall will provide greater protection to the road from the effects of erosion.

The wall will be built using 4.5m-wide concrete panels which will be supported by the steel posts. More concrete will be poured behind the panels up to a thickness of 3.5m. The wall will also be covered with local stone so that it looks like a dry stone wall and blends in with the local landscape.
 
So far, Kier has removed all the loose rocks and stones from the edge of the beck, created strong foundations for the concrete wall panels and installed some of the steel supporting posts.

For more information on companies in this article

Related Content

  • Tunnels eliminate bottlenecks
    February 10, 2012
    Some of the bottlenecks on the multi-lane Mittlere Ring, Munich, Germany, one of the main arterial roads circling the city centre have been eliminated by the addition of new tunnels. The Luise-Kiesselbach Square, the last section of this road improvement effort, is an important traffic hub south-west of the city where motorways A96 from Lindau and A5 from Garmisch meet, causing long delays in daily rush-hour traffic, writes Patrick Smith.
  • Eliminating leaks on Prague bridge
    July 17, 2012
    Stirling Lloyd's Eliminator waterproofing system, found on the decks of many of the world best known highway bridges, is being used in a €8.7 million refurbishment project on the famous 650-year-old Charles Bridge in the Czech capital Prague. Work on the tourist attraction includes repairs to the upper bridge section, replacement of the old concrete deck, installation of the new waterproofing system, replacing stones in sills where required, new drainage and repair to the structures pillars. It will repair
  • New Zealand's bridges survive earthquake
    February 7, 2012
    How is it that New Zealand's recent large and destructive earthquake did so little damage to the bridges in the quake zone? Mary Searle investigates. The magnitude 7.1 earthquake that hit the Canterbury region in New Zealand at 4.35am on Saturday, 4 September was similar in size to the quake that shook Haiti in January. However, the damage in Canterbury was minimal in comparison. A key contributor to this was New Zealand's preparedness for such an event. Positioned on a major fault line, New Zealand has ear
  • Eliminating leaks on Prague bridge
    July 17, 2012
    Stirling Lloyd's Eliminator waterproofing system, found on the decks of many of the world best known highway bridges, is being used in a €8.7 million refurbishment project on the famous 650-year-old Charles Bridge in the Czech capital Prague. Work on the tourist attraction includes repairs to the upper bridge section, replacement of the old concrete deck, installation of the new waterproofing system, replacing stones in sills where required, new drainage and repair to the structures pillars. It will repair