Skip to main content

Kier rebuilds storm-damaged road in England’s tourist Cumbria region

The first of 20 steel posts have been positioned for major road repairs to the A591 road in northern England under a £40 million project to repair December storm damage. The A591 is a major local authority road in Cumbria. It links the M6 motorway near Brettargh Holt with important Lake District tourist destinations such as Kendal, Windermere, Ambleside, Grasmere and Keswick.
May 10, 2016 Read time: 2 mins
Improvements are being made to the A591 in Cumbria

The first of 20 steel posts have been positioned for major road repairs to the A591 road in northern England under a £40 million project to repair December storm damage.

The A591 is a major local authority road in Cumbria. It links the M6 motorway near Brettargh Holt with important Lake District tourist destinations such as Kendal, Windermere, Ambleside, Grasmere and Keswick.

The restoration project is being led by 8100 Highways England, the wholly government-owned road infrastructure agency, on behalf of Cumbria County Council and the road is schedule to be reopened by the end of May.

Last month, Kier Highways was appointed as main contractor for the re-build work on the A591 at Dunmail Raise, which was washed away. Posts are being fastened to the bedrock at the site and will be used to build a retaining wall in the beck at the side of the collapsed part of the A591.
 
Chris Holehouse, Highways England’s senior project manager for the scheme, said that the retaining wall is already starting to take shape. It wall will provide greater protection to the road from the effects of erosion.

The wall will be built using 4.5m-wide concrete panels which will be supported by the steel posts. More concrete will be poured behind the panels up to a thickness of 3.5m. The wall will also be covered with local stone so that it looks like a dry stone wall and blends in with the local landscape.
 
So far, Kier has removed all the loose rocks and stones from the edge of the beck, created strong foundations for the concrete wall panels and installed some of the steel supporting posts.

For more information on companies in this article

Related Content

  • SBS modified asphalt delivers added benefits
    February 17, 2012
    Special additives are used in asphalt mixes to give them added benefits as Patrick Smith reports
  • Pre-stressed bridge decks use modular formwork system
    July 9, 2012
    Imaginative formwork, often using modular components, is helping to shape some challenging bridges worldwide. Patrick Smith reports Traffic volumes in and around Prague have swollen massively in recent years, pushing the existing road network to the limits of its capacity. To permanently ease congestion in the Czech capital's centre, a multi-lane orbital motorway is under construction as a high capacity bypass for central Prague and to link up all the motorways and other major highways radiating from the ci
  • New bridge refurbishment solutions now available
    July 15, 2015
    An array of new bridge refurbishment and repair solutions are available – Mike Woof writes Around the world there are many bridges requiring repairs or refurbishment, and there is a ready market for novel solutions to upgrade existing structures. New developments offer quicker and more efficient ways to improve bridge surfaces and structural performance and add new life to ageing designs. Spancrete is broadening the availability of its novel precast building solutions worldwide by offering these to th
  • Intelligent road studs aim to make roads safer
    May 3, 2012
    High-tech road markings are being used in a bid make roads safer in Europe as Patrick Smith reports Intelligent road studs are being installed on two of the busiest sections of the main roads heading towards the port of Dover in County Kent, south-east England.