Skip to main content

Kier rebuilds storm-damaged road in England’s tourist Cumbria region

The first of 20 steel posts have been positioned for major road repairs to the A591 road in northern England under a £40 million project to repair December storm damage. The A591 is a major local authority road in Cumbria. It links the M6 motorway near Brettargh Holt with important Lake District tourist destinations such as Kendal, Windermere, Ambleside, Grasmere and Keswick.
May 10, 2016 Read time: 2 mins
Improvements are being made to the A591 in Cumbria

The first of 20 steel posts have been positioned for major road repairs to the A591 road in northern England under a £40 million project to repair December storm damage.

The A591 is a major local authority road in Cumbria. It links the M6 motorway near Brettargh Holt with important Lake District tourist destinations such as Kendal, Windermere, Ambleside, Grasmere and Keswick.

The restoration project is being led by 8100 Highways England, the wholly government-owned road infrastructure agency, on behalf of Cumbria County Council and the road is schedule to be reopened by the end of May.

Last month, Kier Highways was appointed as main contractor for the re-build work on the A591 at Dunmail Raise, which was washed away. Posts are being fastened to the bedrock at the site and will be used to build a retaining wall in the beck at the side of the collapsed part of the A591.
 
Chris Holehouse, Highways England’s senior project manager for the scheme, said that the retaining wall is already starting to take shape. It wall will provide greater protection to the road from the effects of erosion.

The wall will be built using 4.5m-wide concrete panels which will be supported by the steel posts. More concrete will be poured behind the panels up to a thickness of 3.5m. The wall will also be covered with local stone so that it looks like a dry stone wall and blends in with the local landscape.
 
So far, Kier has removed all the loose rocks and stones from the edge of the beck, created strong foundations for the concrete wall panels and installed some of the steel supporting posts.

For more information on companies in this article

Related Content

  • More tenders for Lower Thames Crossing
    April 1, 2021
    The winners will build 23km of road connecting to the UK’s longest road tunnel.
  • Towards sustainable mobility
    April 12, 2012
    Tony Marshall, Director at Arup, looks at ways in which the company encourages sustainable mobility.From policy and systems development through to the design and execution of major infrastructure projects, he reviews Arup's global project experiences and research programmes. Space on roads throughout the modern world is decreasing as the volume of cars and road users increases. How can mobility be safeguarded without compromising quality of life or environmental well-being? As engineers, we have a responsib
  • Towards sustainable mobility
    February 20, 2012
    Tony Marshall, Director at Arup, looks at ways in which the company encourages sustainable mobility. From policy and systems development through to the design and execution of major infrastructure projects, he reviews Arup's global project experiences and research programmes
  • Isle of Wight road stability scheme ‘first’ at Niton’s Undercliff
    February 19, 2014
    John Peck Construction has been awarded the contract to carry out the first major road stability scheme at Niton’s Undercliff on the Isle of Wight, England’s largest island. This project is part of a major programme of special geotechnical schemes being delivered by Island Roads (made up of VINCI Concessions, Meridiam Infrastructure and Ringway) under the Highways PFI to maintain the highway at locations prone to ground movement.