Skip to main content

Key UK tunnel opens

The UK's new Hindhead Tunnel is now open to traffic. The ?420 million (£371 million) tunnel runs under the Devil's Punch Bowl in Surrey and will reduce congestion, while boosting safety on the busy A3 route.
February 27, 2012 Read time: 2 mins
The UK's new Hindhead Tunnel is now open to traffic. The €420 million (£371 million) tunnel runs under the Devil's Punch Bowl in Surrey and will reduce congestion, while boosting safety on the busy A3 route. The 1.8km tunnel has taken four-and-a-half years to construct and lies on the London-to-Portsmouth A3 road. The twin-bore tunnel is one of the longest in England and will be used by 30,000 vehicles/day. The new tunnel will allow the existing A3, between the National Trust cafe and Boundless Road, to be closed to through-traffic. The tunnel forms part of a 6.4km bypass of the Surrey village of Hindhead. The project will remove a major source of congestion thus benefiting motorists and the local community whilst also cutting pollution to preserve the Area of National Beauty that is the Devil's Punch Bowl. The scheme commenced in 2007 with the tunnel being dug the following year and has won awards for its innovations and safety record. The tunnel itself contains state-of-the-art safety features, including the UK's first radar-based incident detection system and 100% CCTV coverage. Another innovative addition was the inclusion of 2696 Astucia Hardwired Bi-Directional Studs which will stream light and guide motorists safely through the tunnel. In October 2010, 868 2696 Astucia Hardwired Bi-Directional studs were installed split equally between the two tunnel bores. The studs are bi-directional meaning they emit a full 180 °of illumination when switched from uni-directional to bi-directional delineation when in the contra flow mode.

For more information on companies in this article

Related Content

  • Traffic control solution manufacturers win key project works
    September 26, 2013
    Traffic control system manufacturers have recently supplied some of their cutting-edge technology to major projects in Europe. Meanwhile, in southern Asia, another leading firm in the sector is helping reduce chronic traffic congestion in Indonesia’s capital, Jakarta. Guy Woodford reports Solutions supplied by Siemens Mobility & Logistics (M&L) are helping the Rijkswaterstaat improve traffic conditions at the Coentunnel in Amsterdam, one of the most heavily used traffic arteries in the Netherlands, used
  • Controlling influence
    January 3, 2013
    New lane control solutions from major roadmarking companies have been installed on highways across the world over recent months. Guy Woodford reports on some of them. Clearview Traffic Group (CTG) recently clocked up the installation of over 70,000 Astucia active flush and surface mounted road studs in the UK. CTG has been involved in numerous road stud installation projects on motorways and other road types in the UK and many other countries worldwide. Its UK installations include over 4,500 Astucia road s
  • Simple road safety measures save lives
    February 15, 2012
    Elementary road safety measures quickly pay back the costs of investment and, more importantly, help save lives as Patrick Smith reports. More than 300 people in the UK are alive today or have avoided the prospect of a lifetime of special care because just 15 roads have had simple improvements put in place.
  • State-of-the art road tunnels in construction and use of ITS
    April 25, 2013
    A wealth of major road tunnel construction projects and significant cant ITS installations within existing key road tunnels have been recently completed or will soon be underway. Guy Woodford examines some of them. A state-of-the art Tunnel Boring Machine (TBM) - the 10th largest ever to be built worldwide will be put to work later this year on New Zealand Transport Agency’s landmark Waterview Connection project in Auckland. The giant Herrenknecht-manufactured machine will be used to construct the twin 2.5