Skip to main content

Key UK tunnel opens

The UK's new Hindhead Tunnel is now open to traffic. The ?420 million (£371 million) tunnel runs under the Devil's Punch Bowl in Surrey and will reduce congestion, while boosting safety on the busy A3 route.
February 27, 2012 Read time: 2 mins
The UK's new Hindhead Tunnel is now open to traffic. The €420 million (£371 million) tunnel runs under the Devil's Punch Bowl in Surrey and will reduce congestion, while boosting safety on the busy A3 route. The 1.8km tunnel has taken four-and-a-half years to construct and lies on the London-to-Portsmouth A3 road. The twin-bore tunnel is one of the longest in England and will be used by 30,000 vehicles/day. The new tunnel will allow the existing A3, between the National Trust cafe and Boundless Road, to be closed to through-traffic. The tunnel forms part of a 6.4km bypass of the Surrey village of Hindhead. The project will remove a major source of congestion thus benefiting motorists and the local community whilst also cutting pollution to preserve the Area of National Beauty that is the Devil's Punch Bowl. The scheme commenced in 2007 with the tunnel being dug the following year and has won awards for its innovations and safety record. The tunnel itself contains state-of-the-art safety features, including the UK's first radar-based incident detection system and 100% CCTV coverage. Another innovative addition was the inclusion of 2696 Astucia Hardwired Bi-Directional Studs which will stream light and guide motorists safely through the tunnel. In October 2010, 868 2696 Astucia Hardwired Bi-Directional studs were installed split equally between the two tunnel bores. The studs are bi-directional meaning they emit a full 180 °of illumination when switched from uni-directional to bi-directional delineation when in the contra flow mode.

For more information on companies in this article

Related Content

  • Tunnel waterproofing solutions
    February 29, 2012
    Tunnels are the highest value assets on a highway, making their operation, safety and maintenance of paramount importance. Patrick Smith reports
  • Brisbane’s Legacy Way Tunnel is open to traffic
    June 4, 2015
    An official opening has been carried out for Australia’s Legacy Way Tunnel. The 4.6km route located in Brisbane, Queensland is open to traffic. The construction project was handled by Transcity, formed by Spanish contractor firm Acciona along with BMD Constructions and Ghella. This is the first major project in Australia with which Acciona has been directly involved. The project was awarded in 2010 and cost in the region of US$1.64 billion to construct. It was originally due for completion in late 2014. The
  • Upgrading a busy A road link in the UK
    July 4, 2018
    The upgrade to the UK’s busy A14 route will address a significant traffic bottleneck - Mike Woof writes The UK is suffering badly from traffic congestion, a problem that is particularly severe in and around its major cities. Lack of investment in road construction over many years has resulted in a major backlog of work, while the country has seen growing vehicle numbers. To make matters worse, there have been few additions to the major road network since the late 1980s and early 1990s. And the combinatio
  • Smart motorway project for UK’s M3
    July 23, 2014
    Balfour Beatty is to work on a €163.5 million (£129 million) upgrade project for a 21.4km stretch of the M3 motorway in the UK. The work involves upgrading the route to smart motorway status and is being carried out for the UK Government’s Highways Agency. This project will increase capacity, reduce congestion and shorten journey times for the 120,000 motorists/day using the route. This section of the motorway runs through the counties of Hampshire and Surrey, between Junction 2 which is interchange with th