Skip to main content

Key route widening for Pennsylvania

Work is now starting on the first construction phase of US Route 219 from Somerset to Meyersdale in Somerset County, Pennsylvania. The project will see the route widened to four lanes, with the work being constructed through three main contracts and taking an estimated five years to build. The project is expected to improve safety along a 17km stretch of US219. The work includes two new interchanges, one at the Mason Dixon Highway and the other at Mud Pike. The project was originally conceived in the 1970s
August 28, 2013 Read time: 2 mins
Work is now starting on the first construction phase of US Route 219 from Somerset to Meyersdale in Somerset County, Pennsylvania. The project will see the route widened to four lanes, with the work being constructed through three main contracts and taking an estimated five years to build. The project is expected to improve safety along a 17km stretch of US219. The work includes two new interchanges, one at the Mason Dixon Highway and the other at Mud Pike. The project was originally conceived in the 1970s but the planning was delayed until 1992 when 4907 PennDOT conducted a study determining the need for an expansion between the PA Turnpike in Somerset to I-68 in Maryland. The most immediate need identified was for the four lane Meyersdale Bypass project.

The first phase will be earthmoving, which is expected to cost US$121 million and will take three years to complete. This contract is being handled by the Joseph B Fay Company and requires moving around 7.85 million m3 of material, grading the roadway template, and installing the drainage for the majority of the 17km corridor. The second phase of construction is for structures which is expected to cost $92 million, will include building 10 bridges and should take two years to complete. The third phase will be the paving of the highway and is estimated to cost $53 million, with work beginning in 2016 and taking around two years to complete.

For more information on companies in this article

Related Content

  • Virginia tunnel project seeing advance
    July 19, 2023
    Virginia’s massive tunnel project is seeing advance.
  • Oklahoma turnpike project for Atkins
    April 12, 2018
    Atkins, part of the SNC-Lavalin Group, is providing construction management services for the Oklahoma Turnpike Authority (OTA).
  • Lane picks up Florida SR408 widening project in Orange County
    July 18, 2017
    Lane Construction Corporation has won a US$76 million contract to widen a section of State Road 408 in Orange County, Florida.The project entails adding a thirds lane to each carriageway over a 5.2km stretch of SR408. It will also involve widening a ramp from two lanes to three lanes, adding sound walls as well as extra open road tolling - ORT - lanes.
  • Formwork solutions for bridge maintenance and repair
    January 6, 2015
    An array of innovative formwork solutions have helped in the repair and construction of key bridge links - Mike Woof writes Formwork producers are continually developing novel solutions for bridge maintenance and construction applications. Several key structures have benefited from the novel use of formwork systems, with suppliers such as Doka, PERI, Pilosio and RMD all working on important structures in recent times. In Estonia, construction work is underway on the bypass around Tartu, the country’s