Skip to main content

Key road link in South West Germany

A new road link has been constructed that connects the German municipalities of Weil am Rhein and Lörrach. The road has taken seven years to construct and includes a 347m long tunnel. Located in the South West of Germany, the road actually passes through Switzerland and has cost around €100 million to construct.
October 8, 2013 Read time: 1 min
A new road link has been constructed that connects the German municipalities of Weil am Rhein and Lörrach.  The road has taken seven years to construct and includes a 347m long tunnel. Located in the South West of Germany, the road actually passes through Switzerland and has cost around €100 million to construct.

Related Content

  • Pesky parakeet piques Palatinate police
    May 19, 2016
    Police in a small German town were stumped when their speed trap camera went off clocking a vehicle doing 30kph in a 20kph zone. The photo, taken on a clear day at 10am, showed no object, according to German media reports. But on closer examination, police in the town of Zweibrücken, in the south west, spotted a tiny airborne object – a green ring-necked parakeet – in mid-flight. “After close visual inspection of the photo taken at the scene we solved the puzzle,” the Rhineland Palatinate police sa
  • Tanami Road to be sealed for 314km
    May 24, 2022
    Sealing part of the 1,077km Tanami Road in Australia’s outback could transform local farming.
  • Nepal tunnel project tender
    June 10, 2021
    The tender process is opening for a tunnel project in Nepal.
  • Progress for Norwegian tunnel project
    September 21, 2018
    Swedish contractor Skanska reports steady progress on its project to construct the Strømnes to Sprova tunnel connection in Norway. The firm has completed the tunnel excavation portion of the work for both the 600m long Holmvik Tunnel and 1,000m long Strømnes Tunnel. The project is costing around €36.5 million and the new road link will measure 5.4km in all, which includes the new tunnels. Work commenced in October 2017 and should be complete in the third quarter of 2019 if all goes to plan. The project is l