Skip to main content

Key road link in South West Germany

A new road link has been constructed that connects the German municipalities of Weil am Rhein and Lörrach. The road has taken seven years to construct and includes a 347m long tunnel. Located in the South West of Germany, the road actually passes through Switzerland and has cost around €100 million to construct.
October 8, 2013 Read time: 1 min
A new road link has been constructed that connects the German municipalities of Weil am Rhein and Lörrach.  The road has taken seven years to construct and includes a 347m long tunnel. Located in the South West of Germany, the road actually passes through Switzerland and has cost around €100 million to construct.

Related Content

  • Vinci picks up Lafonataine Tunnel work
    August 12, 2020
    The renovated tunnel is expected to have about 40 years of life.
  • New bridge being planned for German city Bonn
    July 16, 2018
    A new bridge project is being planned for the German city of Bonn. The city has three bridges crossing the Rhein River, the North, South and Kennedy Bridges. The North Bridge is in need of replacement as it is no longer able to meet the city’s traffic needs. The existing structure will be demolished and replaced with a new bridge in a project worth €205 million. Plans should be ready for the new link in 2020, with construction expected to commence in 2028.
  • Road repairs for Germany’s Scheswig-Holstein
    February 3, 2022
    Road repairs are planned for Germany’s Scheswig-Holstein Province.
  • Construction of Fehmarn Belt Link could start in 2019
    February 27, 2018
    Construction of a Fehmarn Belt Link could start a year from now – more than a year ahead of schedule, according to Danish media reports. The timing was put forward by Holger Schou Rasmussen, chairman of Femernbælt Development, and Kristian Pihl Lorenzen, the Liberal Party spokesman for traffic issues. They reportedly said that a pending environmental court case in Germany that has stalled approval by German authorities won’t hold up construction of the 18km crossing as much as had been feared. As late as