Skip to main content

Key Philippines highway now open to traffic

The Muntinlupa Cavite Expressway in the Philippines is now carrying tolled traffic. The route was open for a month toll free for its initial operations. Ayala Corporation has the concession for the route, while Egis supplied the traffic control equipment and has a subcontract to operate and maintain the technology on the expressway for seven years. The MCX expressway was previously called the Daang Hari – SLEX Link Road. This 4km long toll road links the South Luzon Expressway (SLEX) to the Daang Hari road
August 25, 2015 Read time: 2 mins
The Muntinlupa Cavite Expressway in the Philippines is now carrying tolled traffic. The route was open for a month toll free for its initial operations. 6838 Ayala Corporation has the concession for the route, while 2643 Egis supplied the traffic control equipment and has a subcontract to operate and maintain the technology on the expressway for seven years. The MCX expressway was previously called the Daang Hari – SLEX Link Road. This 4km long toll road links the South Luzon Expressway (SLEX) to the Daang Hari road in the south of Metro Manila.

The route is comparatively short but is fairly complex, with 13 lanes. It provides a seamless connection with the busy SLEX expressway serving all the provinces south of Metro Manila, carrying some 240,000 vehicles/day. This concession forms part of the public private partnership (PPP) programme of the Republic of the Philippines and was the first one to be awarded.

For more information on companies in this article

Related Content

  • Australian mega link route opens
    November 29, 2012
    Australia’s largest and most complex transport infrastructure project in the city of Brisbane has been officially opened to traffic. The first vehicles have now used the Airport Link, Northern Busway (Windsor to Kedron) and Airport Roundabout Upgrade projects, which together form an extensive US$5.85 billion transport project. The project in Australia’s third most populous city in the state of Queensland comprises a toll road and dedicated busway route, together involving almost 12km of tunnels (described
  • India highway link opens to traffic
    March 6, 2018
    A new stretch of highway is now opening to traffic in India. The 80km stretch of highway runs between Kundli and through Manesar to Palwal. Called the KMP Expressway, the route has had something of a checkered history and has been completed somewhat later than originally intended. The concession was originally awarded in 2006 and the road should have been completed in 2009, according to the planned timeline.
  • Republic of Ireland’s N25 New Ross Bypass achieves financial close
    March 3, 2016
    The €230 million N25 New Ross Bypass public-private partnership (PPP) project in County Wexford, Republic of Ireland has reached financial close. Mott MacDonald is technical advisor on the public-private partnership, awarded by the National Roads Authority, otherwise known as Transport Infrastructure Ireland. Work will be carried out by BAM Ireland and Dragados, a construction division of ACS Group, based in Spain. The scheme involves construction of 13.6km of dual carriageway and 1.2km of new or u
  • US$905 million loan for Philippines road
    January 29, 2025
    A US$905 million loan for a Philippines road project