Skip to main content

Key Philippines highway now open to traffic

The Muntinlupa Cavite Expressway in the Philippines is now carrying tolled traffic. The route was open for a month toll free for its initial operations. Ayala Corporation has the concession for the route, while Egis supplied the traffic control equipment and has a subcontract to operate and maintain the technology on the expressway for seven years. The MCX expressway was previously called the Daang Hari – SLEX Link Road. This 4km long toll road links the South Luzon Expressway (SLEX) to the Daang Hari road
August 25, 2015 Read time: 2 mins
The Muntinlupa Cavite Expressway in the Philippines is now carrying tolled traffic. The route was open for a month toll free for its initial operations. 6838 Ayala Corporation has the concession for the route, while 2643 Egis supplied the traffic control equipment and has a subcontract to operate and maintain the technology on the expressway for seven years. The MCX expressway was previously called the Daang Hari – SLEX Link Road. This 4km long toll road links the South Luzon Expressway (SLEX) to the Daang Hari road in the south of Metro Manila.

The route is comparatively short but is fairly complex, with 13 lanes. It provides a seamless connection with the busy SLEX expressway serving all the provinces south of Metro Manila, carrying some 240,000 vehicles/day. This concession forms part of the public private partnership (PPP) programme of the Republic of the Philippines and was the first one to be awarded.

For more information on companies in this article

Related Content

  • Key Philippines highway projects commencing
    November 28, 2016
    Two major highway projects are now moving forward in the Philippines. One is for the development of a highway stretch to connect the North Luzon Expressway and South Luzon Expressway. The other is for a new coastal road stretch close to Davao City. The US$485million North Luzon Expressway to South Luzon Expressway highway connection is being handled under a 35 year concession package. Metro Pacific Tollways (MPT) is investing $332 million in the project, which is being handled under the build-operate-tra
  • Metro Pacific Tollways starts work on Cebu-Cordova Link bridge
    July 10, 2018
    Metro Pacific Tollways has started construction of a toll bridge to connect Mactan island to mainland Cebu.
  • Metro Pacific pushes for Cebu-Mactan bridge in the Philippines
    January 19, 2015
    Metro Pacific Investments Corp (MPIC) is in discussions to form a joint venture for construction of a toll bridge connecting the islands of Mactan and Cebu in the Philippines. Cebu is an island province that incorporates 167 surrounding islands and islets, one of them being Mactan, which lies immediately off Cebu Island, across from Cebu City. MPIC’s subsidiary, Metro Pacific Tollways Development Corp (MPTDC), is proposing an 8.3km bridge costing around US$380 million, according to local media reports
  • Philippines expressway connector project under construction
    March 11, 2019
    Construction work is starting in the Philippines for the new link that will connect the North Luzon Expressway (NLEx) and the South Luzon Expressway (SLEx). The project is costing nearly US$430 million, with the link being built by local toll road firm NLEX Corp. The new link road will be 8km long, running from the end of Harbor Link in Caloocan City to the Polytechnic University of the Philippines (PUP) in Santa Mesa of Manila. The road link will be elevated and the work is due for completion in 2021.