Skip to main content

Key highway project for Qatar

Design and construction work is commencing on a 47km highway project in Qatar. The design and construction portions of the US$1.17 billion project will be handled by Qatar bin Oman Trading and Contracting (Qatar bin Omran) and QDVC. The 47km highway project includes the construction of a 320m cut-and-cover tunnel, 17 bridges and underpasses as well as six viaducts. The project forms the second phase of Qatar’s 200km New Orbital Highway. The work is expected to take 36 months to complete and construction act
April 3, 2014 Read time: 1 min
Design and construction work is commencing on a 47km highway project in Qatar. The design and construction portions of the US$1.17 billion project will be handled by Qatar bin Oman Trading and Contracting (Qatar bin Omran) and QDVC. The 47km highway project includes the construction of a 320m cut-and-cover tunnel, 17 bridges and underpasses as well as six viaducts. The project forms the second phase of Qatar’s 200km New Orbital Highway. The work is expected to take 36 months to complete and construction activities will commence in May 2014. The highway will feature two truck lanes and a five-level dual carriageway for light vehicles. The New Orbital Highway will connect Ras Laffan and Doha. QDVC is 49% owned by 3085 Vinci Construction and 51% by 3438 Qatari Diar.

For more information on companies in this article

Related Content

  • Saudi Arabian capital Riyadh benefiting from major transport investment
    September 9, 2013
    Saudi Arabia is undergoing a series of upgrades to its transport network in a bid to improve Traffic flow rates and boost safety - Mike Woof reports. The massive growth in the use of motor transport worldwide since the start of the 20th century has transformed every country on the planet. But perhaps no country has changed more dramatically than Saudi Arabia, the world’s leading oil producer. At the start of the 20th century Saudi Arabia’s population was small and the country had few industries while it is
  • RMD formwork for Qatar’s tallest bridge on Doha East Corridor
    July 6, 2016
    RMD Kwikform will be supplying tens of thousands of tonnes of its formwork and shoring for construction of Qatar’s tallest bridge on the Doha East Corridor project As well as the bridge, the Corridor contract comprises four interchanges at a total cost of US$612.5 million. Ashghal, Qatar's Public Works Authority, awarded the Corridor project to China Harbour Engineering Design and Construction. Built as a five-lane 11km bypass in Doha, the capital of Qatar, the project will also cater for a rail line
  • Korean contractor conquers in Qatar construction contract
    May 21, 2014
    In Qatar the public works authority, Ashghal, has awarded a highway construction deal worth US$910 million to South Korean firm Daewoo Engineering and Construction (Daewoo E&C). The deal is for a 42km section of road, which forms part of the New Orbital Highway and Truck Route project. The 42km stretch would connect the Dukhan Highway and the Al Khor Link Road, and will feature five interchanges and a number of bridges. The 14 lane road will also feature wastewater treatment systems and smart road traffic c
  • Colombia dual carriageway concession awarded
    January 29, 2021
    A key Colombian dual carriageway concession has been awarded.