Skip to main content

Key highway project for Qatar

Design and construction work is commencing on a 47km highway project in Qatar. The design and construction portions of the US$1.17 billion project will be handled by Qatar bin Oman Trading and Contracting (Qatar bin Omran) and QDVC. The 47km highway project includes the construction of a 320m cut-and-cover tunnel, 17 bridges and underpasses as well as six viaducts. The project forms the second phase of Qatar’s 200km New Orbital Highway. The work is expected to take 36 months to complete and construction act
April 3, 2014 Read time: 1 min
Design and construction work is commencing on a 47km highway project in Qatar. The design and construction portions of the US$1.17 billion project will be handled by Qatar bin Oman Trading and Contracting (Qatar bin Omran) and QDVC. The 47km highway project includes the construction of a 320m cut-and-cover tunnel, 17 bridges and underpasses as well as six viaducts. The project forms the second phase of Qatar’s 200km New Orbital Highway. The work is expected to take 36 months to complete and construction activities will commence in May 2014. The highway will feature two truck lanes and a five-level dual carriageway for light vehicles. The New Orbital Highway will connect Ras Laffan and Doha. QDVC is 49% owned by 3085 Vinci Construction and 51% by 3438 Qatari Diar.

For more information on companies in this article

Related Content

  • Bogota transport infrastructure boost
    April 26, 2016
    The Colombian Government is investing in road infrastructure development, with a large portion of the budget being directed to Bogota. The road infrastructure programme includes 22 projects that will help cut chronic congestion in Colombian capital Bogota. Construction works for Avenida Longitudinal de Occidente (ALO) road expansion are expected to start in the first half of 2016. These will run from the Mondonedo intersection to Boyaca Avenue, in the southern part of the city. The budget for this project i
  • Key highway project in Colombia faces delay
    December 2, 2013
    Work on a key stretch of Colombia’s Ruta del Sol highway project is behind schedule, with the route now unlikely to open to traffic before 2017. The 21.6km section of the highway facing these delays will link Villeta and Guaduas in Cundinamarca. A key challenge is technical as the US engineering firm Gall Zeidler Consultants has warned Colombia’s infrastructure agency (ANI) that this section of the route is geologically unstable. The proposed route could be at risk from slippage and will need to be stabilis
  • Eurovia wins US road contracts in North Carolina
    November 2, 2018
    Eurovia has won two major road contracts in the US worth a total of US$480 million. A subsidiary of the French company Vinci Construction, Eurovia will work on design-and-build contracts that will help improve two road corridors in North Carolina. Eurovia’s work on I-485 in Charlotte involves adding a 26km express toll lane in each direction as well as a free high-occupancy-vehicle lane. The project aims to improve traffic conditions on the highway, which is used by 146,000 vehicles/day and suffers severe
  • Kenyan project for Chinese firm
    March 22, 2012
    A Chinese contractor is to construct the dual carriageway extension to Langata Road in Kenya. Work is commencing shortly on the US$30.6 million project, which will take 15 months to complete.