Skip to main content

Key highway bridge project planned in Germany

A new bridge is planned for the busy A40 Autobahn route, which will be constructed at a busy intersection close to Duisburg.
June 29, 2017 Read time: 1 min

A new bridge is planned for the busy A40 Autobahn route, which will be constructed at a busy intersection close to Duisburg. The bridge will stretch for 4.4km in all and construction is expected to commence in 2020, with the work being handled in two phases. The A40 route is important as it connects with the Netherlands and carries a high percentage of heavy truck traffic.

Related Content

  • Additional highway work is planned for Algeria
    March 26, 2013
    Construction work on Algeria’s planned Hauts-plateaux highway is set to commence at the end of June 2013. The highway will run 1,300km and connect Tébessa with Naâma, with the project being split into three sections. The East stretch will be 220km long while the West section will be 305km long and in the middle will be the 495km Central section. The new highway is expected to provide an important trade route and help improve transport between Algeria and its neighbours and this forms part of Algeria’s 2030
  • Kenyan key contract being built by Bechtel
    August 9, 2017
    Bechtel has won a major project to build and important highway link in Kenya. This will be the first long stretch of high-speed expressway in Kenya and will connect the capital, Nairobi, with the country’s main port, Mombasa. The project for the 473km connection is being supported with financing from US and UK sources. Once the new route is open to traffic, journeys between Nairobi will take just four hours by road, instead of 10 at present.
  • Stonehenge tunnel contract
    July 24, 2019
    A contractor is now being sought for the UK’s Stonehenge Tunnel project. The work involves building a new tunnel and new stretch of dual carriageway, moving the busy A303 route away from the Stonehenge monument.
  • Construction commencing for Mersey gateway project
    September 15, 2014
    Work is now starting on the road links that will connect to the new Mersey Gateway Bridge, close to the UK city of Liverpool. The first work is being carried out at Junction 12 of the M56 in Runcorn, with workers commencing site clearance at the roundabout where the motorway joins the Weston Point Expressway (A557). This will take around six months to complete, with much of the work being carried out during off-peak traffic times so as to minimise congestion and this portion of the project should be finishe