Skip to main content

Key highway bridge project planned in Germany

A new bridge is planned for the busy A40 Autobahn route, which will be constructed at a busy intersection close to Duisburg.
June 29, 2017 Read time: 1 min

A new bridge is planned for the busy A40 Autobahn route, which will be constructed at a busy intersection close to Duisburg. The bridge will stretch for 4.4km in all and construction is expected to commence in 2020, with the work being handled in two phases. The A40 route is important as it connects with the Netherlands and carries a high percentage of heavy truck traffic.

Related Content

  • China’s massive new highway projects unveiled
    May 19, 2017
    Plans for massive highway construction projects have been unveiled in China. A 451km highway has been announced that will connect the cities of Yibin an Panzhihua. This is expected to cost as much as US$12 billion, with two firms carrying out the project under the build-operate-transfer model. Construction is due to commence later this year and is expected to take five years to complete. Meanwhile in Yunnan Province, the authorities are planning two highway projects worth a total of $3.75 billion. A new 50k
  • A new Indian cable-stayed bridge will improve transport connections
    March 2, 2015
    A major new cable-stayed bridge is being constructed in India - Partha Bratim Basistha reports. In India the construction of a major cable-stayed bridge is underway that will boost connections from capital Delhi to its surrounding areas. The bridge is being built in a bid to ease growing interstate traffic movement between Delhi and the surrounding North Indian states of Punjab, Uttar Pradesh, Haryana and Himachal Pradesh. Named Signature Bridge, this is a landmark structure due to its design aesthetics and
  • Lueg Bridge work sparks congestion fears
    June 23, 2022
    Lueg Bridge, along Austria’s section of the Brenner Pass route, is slated for major rehabilitation work as part of upgrades to the tolled motorway.
  • Concrete pumps speed busy road upgrade
    February 14, 2012
    WORK ON a major upgrade at a busy German road junction is expected to be completed by the end of 2011. To assist in the project, two Putzmeister large-boom concrete pumps, an M 58-5 from Berger Beton and an M 62-6 from BFM Betonförderdienst in Munich, arrived at the Neufahrn motorway junction, north of the city. The junction, when viewed from above, looks like a flatly pressed four-leaf clover, and can no longer cope with traffic volumes. Two national motorways, the A 9 and the A 92, intersect at the