Skip to main content

Key Florida highway link wins major award

A major highway connection project located in Tampa, Florida has won a 2014 Outstanding Project Award from the Florida Department of Transportation (FDOT) and the Florida Institute of Consulting Engineers (FICE). The link was opened in January 2014 and was engineered by designer Atkins. The 1.6km-long I-4/Selmon Connector links I-4 with the Lee Roy Selmon Expressway. The US$425 million Connector now carries over 24,000 vehicles/day, which includes some 2,000 heavy vehicles/day. With the construction of the
July 2, 2014 Read time: 2 mins
A major highway connection project located in Tampa, Florida has won a 2014 Outstanding Project Award from the 2697 Florida Department of Transportation (FDOT) and the Florida Institute of Consulting Engineers (FICE). The link was opened in January 2014 and was engineered by designer 3005 Atkins. The 1.6km-long I-4/Selmon Connector links I-4 with the Lee Roy Selmon Expressway. The US$425 million Connector now carries over 24,000 vehicles/day, which includes some 2,000 heavy vehicles/day. With the construction of the link, this traffic has been moved from the streets of the nearby Ybor City, cutting congestion and increasing safety.

The Connector is a four-level, elevated, directional interchange made up of a complex network of 30 bridges. It features a self-contained, overhead, all-electronic toll collection system that can be maintained and repaired without disrupting traffic flow. The steel toll gantries are constructed of two Vierendeel-type trusses that each span 47.24m. Atkins served as lead project engineer and as primary designer of the Connector’s southern portion, which comprised 80% of the overall project. Atkins provided a wide range of professional services, including roadway, bridge, and drainage design; surveying; architecture; landscape design. The project was funded primarily by FDOT, Florida’s Turnpike enterprise, and the 1088 American Recovery and Reinvestment Act of 2009. L Joe Boyer, Atkins CEO, North America, said, “This was the largest construction contract that FDOT District 7 has advertised for bidding, and one of the largest projects ever designed in North America by Atkins.

Tom Barry, PE, director of Atkins’ DOT business unit, added, “This is a project of tremendous importance to the Tampa area, and it’s wonderful to see it get the recognition it deserves. Ten Atkins offices worked together with 30 specialty subconsultants, investing more than 500,000 hours preparing the necessary plans, specifications, and estimates under an aggressive, 36-month design schedule.”

For more information on companies in this article

Related Content

  • Work underway on key Florida road project
    August 22, 2022
    Work is underway on a key Florida road project.
  • Key link on track in US
    April 25, 2012
    Work on the DFW Connector project in Texas is now 50% complete. When it is finished, the DFW Connector project will reduce congestion for drivers in the Dallas-Fort Worth area. The DFW Connector is the largest investment of American Recovery and Reinvestment Act funding, US$260 million, in a highway project.
  • Florida’s I-4 project wins major award
    December 15, 2015
    Florida’s I-4 Ultimate highway project recently won a major award. The I-4 won the Best Transport Project award at the 2015 P3 Awards ceremony. Among entries, the US$2.3 billion highway project was recognised for its scale, complexity, and overall performance. Stretching through Orlando, the I-4 Ultimate project is a massive makeover of 33.6km of highway. It includes over a dozen reconstructed interchanges, 74 rebuilt bridges, 53 new bridges, and construction of four new express lanes. According to the P
  • Florida highway rebuild project
    May 2, 2018
    Rebuilding a congested stretch of highway in Florida will cut congestion and boost safety for commuters - Mike Woof writes. Florida’s 214km-long I-4 highway provides a key transport route between Tampa and Daytona Beach, but has an unenviable reputation for both congestion and safety, with frequent delays due to heavy traffic as well as crashes. The stretch running through the city of Orlando is particularly prone to jams at peak periods, with huge traffic volumes resulting in vehicles having to slow to a c