Skip to main content

Key Chinese tunnel project going ahead

Work is going ahead for a key Chinese tunnel project.
By MJ Woof August 14, 2020 Read time: 3 mins
Chinese firm CRCHI says that it has achieved a major technological advance with the TBM it has built for the Hangzhou Genshan East Road Crossing River Tunnel in China

Plans are moving forward for the construction of the Hangzhou Genshan East Road Crossing River Tunnel in China. The TBM that will be used for the project has been constructed by Chinese firm CRCHI and features a 15.01m diameter slurry cutting shield. Measuring 130m in length, the TBM weighs around 4,300tonnes, has an installed power of 9,755kW and a rated torque of 42,784Nm.

The Hangzhou Genshan East Road Crossing River Tunnel will be located in Hangzhou City, Zhejiang Province, China. The Genshan East Road Crossing Tunnel Project in Hangzhou will be an urban expressway, including the tunnel stretch. In addition the project includes building a comprehensive pipeline gallery, a ground connection line project and auxiliary works.

The total length of the project is 4,725m, including the access roads. Meanwhile, the tunnel measures 4,575m. A 3,160m stretch of the tunnel will be driven using the TBM. Around 2.3km of the tunnel will run directly underneath the Qiantang River.

The tunnel will feature twin tubes and allow traffic speeds of up to 80km/h.

The project faces challenges as the TBM will pass through soft soil layers, reaching a maximum depth of 44.2m. As the tunnel section will feature a diameter of 15.01m, the stability of the tunnel face will be difficult to control. However the engineering team believe that using the TBM will help to control the stability of the tunnel face to prevent collapse.

While advancing in soft soil, the poor stratum bearing capacity and poor permeability is expected to cause the TBM to sink, and the segments to float up. To avoid problems from these effects on the TBM, precision attitude control of the TBM will be crucial, as will high quality of segment box culvert assembly. Due to the high content of viscous particles in the ground formation, a high capacity ground slurry treatment system is required. The TBM has been designed to prevent mud cakes forming on the cutterhead.

Given the length of the tunnel drive, the reliability of the TBM will be crucial. CRCHI says that the TBM has been designed with a particular focus on the reliability of the main drive seal and tailskin seal, as well as for ensuring high wear resistance of the cutterhead, cutters, and slurry pipelines.

Because there may be harmful gases in the formation, the TBM has been installed with reliable harmful gas detection devices and a high-power ventilation system.

The CRCHI R&D department has tackled the key problems. The machine was designed to have soft soil cutterhead which features cutter change in free air, frequency conversion motor for the main drive and retractable cutterhead. Cutting-edge technology include a main drive seal that is automatically pressurised, high precision gas-liquid pressure balance control and simultaneous lifting and assembly of segments and box culverts. The firm claims that this latest unit will offer an increase in performance and reliability, as well as adaptability to challenging geological conditions.

The work for the project is being carried out by the China Railway 14th Bureau.

For more information on companies in this article

Related Content

  • UK’s controversial Stonehenge Bypass tunnel to go ahead
    February 21, 2024
    The UK’s controversial Stonehenge Bypass tunnel project is to go ahead.
  • Modern formwork systems - fast, flexible, safe
    February 21, 2012
    Speed of erection, safety, cost-efficiency and flexibility are among the attributes of modern formwork systems. Modern formwork and scaffolding systems are attractive in particular for their speed of erection, safety, cost-efficiency and flexibility.
  • Bangkok plans to spend US$3.5bn to build mega underground tunnels
    May 24, 2013
    Thailand could emulate Malaysia's twin smart-tunnel project through its own proposed Thailand Underground Tunnelling Group (TUTG) project, with an estimated investment of US$3.5 billion. Under the TUTG propsal, two large tunnels are to be constructed in Bangkok's underground to channel the city's rainwater surplus during heavy monsoons to refill its underground reserves whose water levels are now decreasing. When there is no major flood in Bangkok, the tunnels would be transformed into an underground roadwa
  • MB’s versatile crusher buckets entering Chinese market
    November 21, 2018

    MB crusher is now offering its high performance crusher buckets into the Chinese market, as well as the rest of South East Asia. The firm is introducing two models for excavators, the BF120.4 model to China, which is suitable for excavators in the 30tonne class and above, as well as the BF90.3, which is suited for excavators weighing from 21tonnes and above. In addition, MB Crusher is now offering the MB-L200 crusher bucket, which is designed for use with wheeled loaders, backhoe loaders and skid steer loaders.