Skip to main content

Key A14 upgrade for the UK to cut congestion

A joint venture comprising BAM Nuttall and Morgan Sindall will carry out the 4km widening of the UK’s heavily congested A14 route. The €28.5 million (£24 million) project is being carried out for the Highways Agency to reduce journey times more reliable, improve safety and support proposed local development. Mott MacDonald will carry out the design work for the project. Junctions 7-9 of the A14 are highly congested at present due to a combination of heavy commuter traffic and the high percentage of HGVs car
September 11, 2013 Read time: 2 mins
A joint venture comprising 3137 BAM Nuttall and 2567 Morgan Sindall will carry out the 4km widening of the UK’s heavily congested A14 route. The €28.5 million (£24 million) project is being carried out for the 2309 Highways Agency to reduce journey times more reliable, improve safety and support proposed local development. 2579 Mott MacDonald will carry out the design work for the project. Junctions 7-9 of the A14 are highly congested at present due to a combination of heavy commuter traffic and the high percentage of HGVs carrying freight to and from the nearby port of Felixstowe. The widening scheme will provide an extra lane in each direction within the existing highway boundary between Junction 7 (A43N) and Junction 9 (A509) of the A14 Kettering Bypass. Mott MacDonald’s design retains as many existing features as possible and minimises the use of large construction machinery. This design includes the retention of drainage, safety barriers and lighting within the central reserve where possible and new concrete retaining structures which will be filled with excavated material from site to negate the import of material. Mott MacDonald’s design is due to be finished by the start of 2014, initial construction work on the scheme is due to begin in autumn 2013 and be fully completed by spring 2015.

For more information on companies in this article

Related Content

  • Economic gains from widening the A453 in Nottingham, England
    August 12, 2014
    Work is well underway on turning a busy just over 11km two-lane link road from the city of Nottingham to Junction 24 of the M1 in Leicestershire, England into a four-lane highway. The widened highway will relieve considerable peak-time congestion for travellers to Nottingham, the M1 and East Midlands Airport while also making journeys safer and more reliable. Guy Woodford reports Used by up to 30,000 vehicles a day, the A453 is renowned for congestion at peak travel times. But years of day-to-day commuter a
  • SWARCO helps cut congestion at Dover Port and local roads
    September 29, 2016
    SWARCO is playing a key role in a US$110 million traffic-management improvement scheme at the UK’s Dover Port The port handles nearly $155 billion of trade annually and saw record freight volumes of 2.53 million units in 2015, up 5% on 2014. It handles up to 17% of all UK trade so its efficient operation is essential.
  • UK’s A14 widening project ramps up with a recruitment drive
    November 11, 2016
    Contractors are gearing up for one of the UK’s largest road projects, the 34km widening of the A14 between the town of Huntingdon and city of Cambridge. The €1.7 billion government-funded scheme will be delivered over four years by a joint venture between Skanska, Costain, Balfour Beatty and Carillion.
  • UK motorway upgrade ahead of schedule
    May 1, 2014
    Joint venture contractor Skanska Balfour Beatty has completed work on a 19km section of the M25 motorway in the UK, six months ahead of schedule. Work on the M25 scheme between junctions 5 and 7 in Kent and Surrey forms part of a new generation of technology-driven improvements on the UK’s strategic road network.