Skip to main content

Key A14 upgrade for the UK to cut congestion

A joint venture comprising BAM Nuttall and Morgan Sindall will carry out the 4km widening of the UK’s heavily congested A14 route. The €28.5 million (£24 million) project is being carried out for the Highways Agency to reduce journey times more reliable, improve safety and support proposed local development. Mott MacDonald will carry out the design work for the project. Junctions 7-9 of the A14 are highly congested at present due to a combination of heavy commuter traffic and the high percentage of HGVs car
September 11, 2013 Read time: 2 mins
A joint venture comprising 3137 BAM Nuttall and 2567 Morgan Sindall will carry out the 4km widening of the UK’s heavily congested A14 route. The €28.5 million (£24 million) project is being carried out for the 2309 Highways Agency to reduce journey times more reliable, improve safety and support proposed local development. 2579 Mott MacDonald will carry out the design work for the project. Junctions 7-9 of the A14 are highly congested at present due to a combination of heavy commuter traffic and the high percentage of HGVs carrying freight to and from the nearby port of Felixstowe. The widening scheme will provide an extra lane in each direction within the existing highway boundary between Junction 7 (A43N) and Junction 9 (A509) of the A14 Kettering Bypass. Mott MacDonald’s design retains as many existing features as possible and minimises the use of large construction machinery. This design includes the retention of drainage, safety barriers and lighting within the central reserve where possible and new concrete retaining structures which will be filled with excavated material from site to negate the import of material. Mott MacDonald’s design is due to be finished by the start of 2014, initial construction work on the scheme is due to begin in autumn 2013 and be fully completed by spring 2015.

For more information on companies in this article

Related Content

  • Highways Agency appoints firms to consider A27 bypass options
    December 15, 2014
    The Highways Agency in the UK has appointed a joint venture between Mott MacDonald and Grontmij to analyse various options for upgrades to the A27 Chichester Bypass. The aim of this project is to improve traffic flow and relieve congestion. The bypass is a 5km dual carriageway with five roundabouts and one signal control junction. It provides a key east-west transport link along the south coast of England. This connects Brighton, Worthing, Chichester, Portsmouth, Southampton. It currently suffers from heavy
  • Tackling the UK's traffic congestion
    February 28, 2012
    The biggest problem on UK roads is congestion, and there is no shortage of ideas as to how it should be tackled. Patrick Smith reports. Congestion (and how to relieve it), along with safety, are among the top priorities facing those responsible for looking after the UK's roads. Road pricing, car-share lanes, greener vehicle initiatives and alternative methods of transport such as buses, trams and rail are all part of the approach, but prior to the current economic climate the nation's love affair with the c
  • Plans moving forward for key Turkish highway
    October 11, 2013
    Plans are moving forward in Turkey for the construction of a new highway project. Mott MacDonald has been named lenders’ technical advisor by the IC Ictas-Astaldi (ICA) consortium for a 60km section of the Northern Marmara highway. This deal is significant and the stretch forms the first of a number of phases of the highway. The project is being delivered under a 10 year, US$2.5 billion public-private partnership (PPP).
  • Key link upgrade for Washington State
    February 23, 2012
    The US state of Washington's Department of Transportation (WSDOT) has awarded a major contract to rebuild and upgrade State Route 520 in King County.