Skip to main content

Kerch Strait bridge/tunnel decision by end of 2014

The best option for a bridge or tunnel to connect the Taman Peninsula in Russia with the Crimea Peninsula across the Kerch Strait will be chosen by the end of 2014. According to Russia's Transport Minister Maxim Sokolov, the feasibility study will focus on several options, including a road bridge, a road-rail bridge and a tunnel project. According to Deputy Transport Minister Sergey Aristov, the construction cost estimated at US$3 billion is within the agreed budget. It may be implemented via a public-pri
March 21, 2014 Read time: 1 min
The best option for a bridge or tunnel to connect the Taman Peninsula in Russia with the Crimea Peninsula across the Kerch Strait will be chosen by the end of 2014.

According to Russia's Transport Minister Maxim Sokolov, the feasibility study will focus on several options, including a road bridge, a road-rail bridge and a tunnel project.

According to Deputy Transport Minister Sergey Aristov, the construction cost estimated at US$3 billion is within the agreed budget. It may be implemented via a public-private partnership. RZD is willing to join the project.

Related Content

  • Transstroy’s ambitions for Sochi 2014 Olympics and beyond
    September 30, 2013
    Igor Pankin is CEO of Transstroy, one of Russia’s largest transport infrastructure construction companies, a part of Oleg Deripaska’s Basic Element group. Created in 1992, the company has completed major construction projects with a combined worth of more than €4 billion (RUB 121 billion) The Olympic motto, ‘Swifter, Higher, Stronger’, is very appropriate for the Sochi 2014 Winter Olympics – and not just in reference to the action in its stadiums and on its slopes. The city has been transformed from a small
  • Messina Strait bridge tender due?
    August 10, 2023
    The Messina Strait bridge tender is due to open soon.
  • Denmark concerned over rising cost of Fehmarn Belt Fixed Link
    February 19, 2015
    The Danish government is in talks with contractors over the latest rise in cost estimates for the proposed prestigious Fehmarn Belt Fixed Link between Denmark and Germany. Contractors have estimated an extra €295.5 million will be needed. This is in addition to a statement last November by the contracting company Femern saying that costs had risen nearly €900 million. The total rise price hike is nearly €1.2 billion. This puts the final cost of the 18km tunnel including two railway tunnels, two motorway tun
  • US DOTs in critical funding battle
    February 9, 2012
    In the US, state DOTs are preparing for the upcoming reauthorisation battle in a tough economic and political climate. Set to expire by the end of the year, the bill is a critical funding source for many transportation projects in the US. However transportation officials in the US are facing a tough battle as the political and economic climate has changed considerably since the last reauthorisation was passed, shortly after President Obama's inauguration in January 2009. Since then, the recession has contin