Skip to main content

Kerch connection in Russia

The Tavrida Federal highway that will connect with the Kerch Strait Bridge in Russia has a projected cost of US$2.92 billion. The road will run through Kerch, Feodosia, Simferopol, Bakhchisarai, and Sevastopol and will measure 277km long. The project is being handled by contractor VAD Company.
October 13, 2017 Read time: 1 min

The Tavrida Federal highway that will connect with the Kerch Strait Bridge in Russia has a projected cost of US$2.92 billion. The road will run through Kerch, Feodosia, Simferopol, Bakhchisarai, and Sevastopol and will measure 277km long. The project is being handled by contractor VAD Company.

Related Content

  • Moscow’s first toll road is being planned
    May 21, 2013
    In Russia’s capital Moscow the finishing touches are being put to a plan to construct the city’s first tolled link. The northern relief road for Kutuzovsky prospect is expected to cost US$1.91 billion to build and will stretch a distance of 10.3km. The tender process for the concession package is being prepared at present and is expected to open for bids shortly. Once complete the new link will connect Moscow’s business centre with Molodogvardeyskaya junction. Meanwhile in the Russian city of Tula, some 193
  • Athabasca’s Hwy 813 bridge to be replaced
    May 16, 2022
    The new bridge over the Athabasca River in the Canadian province of Alberta will include two 3.7m-wide lanes with 1.8m-wide shoulders on either side as well as a pedestrian sidewalk.
  • Key Russian road construction complete
    December 5, 2016
    Construction work on the Central Section of Russia’s Western High-Speed Diameter (WHSD) in St Petersburg is complete, with some small detail work now being finished off. The WHSD connects the Southern, Central and Northern sections of St Petersburg and will open to traffic at the end of December. VTB Capital was a key participant in funding the construction of the Central Section and is a major shareholder in the consortium that will operate the entire WHSD route.
  • Cambodian connection – construction completion
    May 13, 2022
    Completion of the contract to construct a new Cambodian connection is coming soon.