Skip to main content

Kenya road upgrade with asphalt surfacing

An upgraded road link will provide improved transport connections for the towns of Ikutha, Mutomo, Kitui, Kabati and Migwani in Kenya. The road is now being surfaced with asphalt along its length, with the work costing US$182 million. This road stretch connects with the main Nairobi-Mombasa highway at Kibwezi and will provide a much needed transport upgrade for the towns it serves. The work is being carried out on Route 87 from Kibwezi to the junction at Katheka, and then along the C94 to Migwani. The C94
February 12, 2018 Read time: 1 min

An upgraded road link will provide improved transport connections for the towns of Ikutha, Mutomo, Kitui, Kabati and Migwani in Kenya. The road is now being surfaced with asphalt along its length, with the work costing US$182 million. This road stretch connects with the main Nairobi-Mombasa highway at Kibwezi and will provide a much needed transport upgrade for the towns it serves. The work is being carried out on Route 87 from Kibwezi to the junction at Katheka, and then along the C94 to Migwani. The C94 then connects with the main A3 highway that runs between Nairobi and Liboi, on the border with Somalia. This road improvement project will deliver a boost t economic development in the area as it is the first time sections of the route have been surfaced with asphalt in 55 years.

Related Content

  • Malaysia’s massive road building project is advancing the use of technology
    August 10, 2020
    Malaysia’s huge Pan Borneo Highway project is benefiting from the use of some of the latest technologies in its planning, design and construction
  • Construction materials and road design in East Africa
    June 25, 2013
    An envisaged shortage in the supply of angular rock or crushed stone in Tanzania and a determination to conserve the environment by Kenyan authorities dictated the engineering design of a multi-national road linking the two largest economies in Eastern Africa. Shem Oirere reports The cost of buying crushed stone or hiring a site for mining the material and the expenses of moving it from the crushing site to the project area, saw designers opt for an intermediate alignment and discarding of the inner and out
  • Huge potential of Kenya’s bitumen market
    May 17, 2017
    Kenya’s bitumen demand to grow - Shem Oirere writes. Kenya’s demand for bitumen products is set to increase with recent budget allocations for construction of new roads, ports and airports and for maintenance of existing transport infrastructure. The country’s economic growth rose from 5.3% in 2014 to 5.5% in 2015 and is projected to hit 6% and 6.4% in 2016 and 2017 respectively according to the African Development Bank, triggering demand for better and modern infrastructure particularly in the transport se
  • A road challenge for Zimbabwe
    November 8, 2023
    Construction work is finally underway for a major new highway link in Zimbabwe after many years of false starts.