Skip to main content

Kazakhstan bridge project complete

The opening of a new bridge in Kazakhstan that spans the Irtysh River is now offering a shorter route for drivers. The link is 12.3km long and is now the longest such structure in Central Asia, while the project cost around US$157 million. Its length was necessary as the bridge crosses a floodplain area, with a channel that can widen considerably following periods of heavy rain. Located in the country’s Pavlodar region, the bridge cuts the route used previously by over 40km. The bridge is expected to carry
December 16, 2016 Read time: 2 mins
The opening of a new bridge in Kazakhstan that spans the Irtysh River is now offering a shorter route for drivers. The link is 12.3km long and is now the longest such structure in Central Asia, while the project cost around US$157 million. Its length was necessary as the bridge crosses a floodplain area, with a channel that can widen considerably following periods of heavy rain. Located in the country’s Pavlodar region, the bridge cuts the route used previously by over 40km. The bridge is expected to carry around 10,000 vehicles/day and will improve the country’s transport connections with Russia while also providing a key central section of the road route that runs all the way from China to Western Europe.

The structure rests on 1,146 bored piles and 66 bridge supports and is constructed from around 13,500tonnes of steel as well as 150,000m3 of concrete. The bridge project marks something of a step ahead for the country as it utilised modern construction techniques, such as the use of a heavy lifting process with cables and jacks to erect the central span.

Related Content

  • Romanian bridge project well underway
    June 8, 2022
    Romania’s Braila Bridge project is well underway.
  • Motorway's tricky cable installation
    February 6, 2012
    The UK is now benefiting from the installation of sophisticated automated traffic management equipment and information signs on its motorway network. But with heavy traffic volumes on these roads, novel techniques have had to be implemented. One such operation, organised by client The Highways Agency and its consulting engineer A.One+, has recently been underway on the M56 motorway between Junctions 9 and 16 in north-west England under the Triple Package Advanced Works designation. To minimise traffic distu
  • Indeco cuts up New York City’s old Kosciuszko Bridge
    November 23, 2017
    An Indeco ISS 45/90 is proving essential for demolishing the old Kosciuszko Bridge in New York City. New York City’s old 1.9km Kosciuszko Bridge, which crosses Newtown Creek connecting Green Point, Brooklyn with Maspeth, Queens, has been out of service since April. By the end of the year, the polygonal Warren through-truss structure will be no more. To replace the old bridge, in 2009, the New York State Department of Transportation planned the construction of two cable-stayed replacement bridges.
  • Forming iconic structures
    July 18, 2012
    Specially designed and constructed formwork is being used to create some iconic bridges worldwide The Golden Ears Bridge over the Fraser River will unite the municipalities of Richmond, New Westminister and Delta in the scenic British Columbia province of Canada. The bridge, part of a CAD$800 million (US$670 million) project, is an 'extra dosed' cable stayed bridge, which means the deck will be supported by both cables and the structure itself. This design reduces the overall height of the two towers as req