Skip to main content

Karlsruhe’s new road tunnel project

Construction will commence in April 2017 on a new road tunnel link in Karlsruhe. Austrian contractor STRABAG has an 84% stake in the consortium, which also includes Schleith, building the link. Civil design is being handled by Ed Züblin meanwhile. The new Kriegsstraße vehicle tunnel in Karlsruhe will carry two lanes of road traffic underground, while providing a surface connection for trams, pedestrians and cyclists. The tunnel construction forms part of the wider Kombilösung public transport infrastructure
December 13, 2016 Read time: 2 mins
Construction will commence in April 2017 on a new road tunnel link in Karlsruhe. Austrian contractor 945 STRABAG has an 84% stake in the consortium, which also includes Schleith, building the link. Civil design is being handled by Ed Züblin meanwhile. The new Kriegsstraße vehicle tunnel in Karlsruhe will carry two lanes of road traffic underground, while providing a surface connection for trams, pedestrians and cyclists. The tunnel construction forms part of the wider Kombilösung public transport infrastructure project for Karlsruhe that is intended to help cut congestion. Construction of the new tunnel begin in April 2017, while its completion is scheduled for mid-2021. The tunnel will reroute the through-traffic on Kriegsstraße underground for a distance of 1.6km between Mendelssohnplatz and Karlstor. The tunnel will be built using a cut-and-cover process and will feature a rectangular reinforced concrete frame. The Züblin-led consortium will excavate a 9m deep concrete trench, which will then be roofed over allowing the tram tracks and cycling and pedestrian facilities to be installed on the surface. The work is being divided into nine sections that will be cut, concreted and covered from the top. The close proximity of buildings and the city’s high groundwater levels will ensure that the waterproofing and retaining wall design will be challenging however.

For more information on companies in this article

Related Content

  • Highway 99 revisited
    March 6, 2024
    David Arminas recently returned to Seattle for an inside look at some of the features of the now-complete SR99 tunnel that was a World Highways key project report in November 2017.
  • Formwork innovations help bridge building
    July 7, 2015
    A series of formwork developments are helping with challenging bridge construction projects around the world - Mike Woof writes In the Polish city of Krakow, a cost-effective cable stayed bridge is being constructed using a balanced cantilever technique. The current expansion of the Krakow metropolitan railway network (KST) requires the building of a crossing of the Krakow-Plaszow railway junction. Ensuring that daily rail operations remained unaffected during the construction of the 252m long crossing w
  • Polish island tunnel connection planned
    February 7, 2017
    The tender process is due to commence in Poland for a major new tunnel project in the north of the country. The link will provide an improved road connection for the city of Swinoujscie, running between the islands of Uznam and Wolin. When complete in late 2021 or early 2022, this will be the longest road tunnel ever constructed in Poland. A number of consortia and companies have been preselected by the Polish General Directorate for National Roads and Motorways (GDDKiA) to tender for the project. The plans
  • Italian highway bridge and tunnel link
    February 21, 2022
    A major Italian highway bridge and tunnel link is under construction.