Skip to main content

Karlsruhe’s new road tunnel project

Construction will commence in April 2017 on a new road tunnel link in Karlsruhe. Austrian contractor STRABAG has an 84% stake in the consortium, which also includes Schleith, building the link. Civil design is being handled by Ed Züblin meanwhile. The new Kriegsstraße vehicle tunnel in Karlsruhe will carry two lanes of road traffic underground, while providing a surface connection for trams, pedestrians and cyclists. The tunnel construction forms part of the wider Kombilösung public transport infrastructure
December 13, 2016 Read time: 2 mins
Construction will commence in April 2017 on a new road tunnel link in Karlsruhe. Austrian contractor 945 STRABAG has an 84% stake in the consortium, which also includes Schleith, building the link. Civil design is being handled by Ed Züblin meanwhile. The new Kriegsstraße vehicle tunnel in Karlsruhe will carry two lanes of road traffic underground, while providing a surface connection for trams, pedestrians and cyclists. The tunnel construction forms part of the wider Kombilösung public transport infrastructure project for Karlsruhe that is intended to help cut congestion. Construction of the new tunnel begin in April 2017, while its completion is scheduled for mid-2021. The tunnel will reroute the through-traffic on Kriegsstraße underground for a distance of 1.6km between Mendelssohnplatz and Karlstor. The tunnel will be built using a cut-and-cover process and will feature a rectangular reinforced concrete frame. The Züblin-led consortium will excavate a 9m deep concrete trench, which will then be roofed over allowing the tram tracks and cycling and pedestrian facilities to be installed on the surface. The work is being divided into nine sections that will be cut, concreted and covered from the top. The close proximity of buildings and the city’s high groundwater levels will ensure that the waterproofing and retaining wall design will be challenging however.

For more information on companies in this article

Related Content

  • Karlsruhe’s Rhine bridge planning to restart
    July 15, 2021
    The proposed road bridge would connect Karlsruhe and Wörth and be built around 1.4km from another Rhine bridge.
  • Stockholm contract for STRABAG subsidiary
    June 18, 2018
    STRABAG’s Swedish subsidiary Züblin Scandinavia will carry out a €49 million contract to construct a major interchange in Stockholm. The FSE309 Lovö interchange forms part of the massive Stockholm Bypass project, intended to divert traffic away from the city centre and cut congestion and urban pollution. Included in the project are a new connecting road with four lanes, tunnel sections, drainage systems and facilities for pedestrians and cyclists. The Lovö interchange connects the bypass to the existing Ro
  • Swiss roundabout goes underground
    February 7, 2012
    The Swiss, well-known for their tunnel constructions, have enhanced their reputation with the recent Gotthard Tunnel breakthrough which has created the world's longest tunnel. And in Bern, a roundabout is being re-positioned almost 10m under the ground, which will transform a somewhat dismal road intersection into an attractive gateway to the country's capital. PERI provided a comprehensive formwork solution for the realisation of the massive beams, reinforced concrete slab along with the conically-sh
  • Tampere road tunnel - a strategic link for central Finland
    April 4, 2016
    Progress has been good for an important underground road link in Finland reports Adrian Greeman. Assuming all goes well, the new Ranta, or Lakeside, tunnel in Tampere will open in full six months early; traffic could be running by the end of this year. Work on transforming the rundown city centre with new developments will get a major boost. It is a major achievement on a four-year-long project bringing significant benefits to one of Finland's largest cities. From the government's point of view the scheme w