Skip to main content

JCCBI says US$300m for demolishing Montreal’s old Champlain Bridge

Tearing down the old steel truss cantilever Champlain Bridge in Montreal could cost around US$300 million, according to preliminary estimates by a federal government agency. Also, until the nearby new Champlain Bridge is finished, it will cost US$93 million annually to maintain the old one, according to Jacques Cartier and Champlain Bridges Incorporated (JCCBI), the federal Canadian agency that oversees several major road infrastructure assets in the city. Dismantling will start in 2019 at the earliest and
April 11, 2017 Read time: 2 mins
Tearing down the old steel truss cantilever Champlain Bridge in Montreal could cost around US$300 million, according to preliminary estimates by a federal government agency.

Also, until the nearby new Champlain Bridge is finished, it will cost US$93 million annually to maintain the old one, according to 2880 Jacques Cartier and Champlain Bridges Incorporated (JCCBI), the federal Canadian agency that oversees several major road infrastructure assets in the city.

Dismantling will start in 2019 at the earliest and it will take up to four years, Canadian media reported. JCCBI has said that material from the old bridge will be recycled and used in projects around Montreal.

More than 140,000 cars use it daily, making it one of the busiest single-span bridges in Canada. But years of heavy use of de-icing salt during harsh winters has deteriorated the structure.

Work on a new bridge started in 2016 and it is scheduled to open at the end of 2018.

The 6km Champlain Bridge, opened in 1962, along with approach viaducts is made of prestressed concrete beams supporting a prestressed concrete deck overlaid with paved with asphalt. The total bridge complex is around 14.5km and spans the Saint Lawrence River and Saint Lawrence Seaway, connecting the Montreal boroughs of Verdun and Le Sud-Ouest to Brossard. It is named after the French explorer Samuel de Champlain, who founded Quebec City, the Quebec province’s capital, in 1608.

Together with the Jacques Cartier Bridge, it is administered by JCCBI, a Canadian Crown Corporation which reports to Infrastructure Canada.

For more information on companies in this article

Related Content

  • Vinci picks up Lafonataine Tunnel work
    August 12, 2020
    The renovated tunnel is expected to have about 40 years of life.
  • Canada: Champlain Bridge deal awarded to SNC-Lavalin consortium
    April 17, 2015
    The Canadian government has awarded a multi-billion dollar contract for the Champlain Bridge in Montreal, in the province of Quebec, to a consortium led by SNC-Lavalin. The firm, based in Montreal, will design, build, maintain and operate the toll bridge under a 35-year public-private partnership deal worth between US$2.5-$4.1 billion. The consortium called Signature on the Saint-Lawrence Group includes Spanish firms Dragados Canada and ACS Infrastructures and the US firm Flatiron Construction. Other
  • AtkinsRéalis wins Île d’Orléans Bridge work
    May 2, 2024
    VIDEO: The new US$1.96 billion replacement Île d’Orléans Bridge near Quebec city, Canada, will feature two wider lanes of traffic, shoulders, multi-use lanes for pedestrians and cyclists as well as redevelopment of a major interchange and creation of green spaces.
  • Manitowoc MLC650 cranes keep Champlain Bridge on track
    October 28, 2016
    Two Manitowoc MLC650s are working on a project to replace the Champlain Bridge that spans the Saint Lawrence River in Montreal, Canada. The engineering consortium - Signature on the Saint Lawrence Construction (SSLC) – is assigned to the task. The capacity and reduced ground preparation made possible by the MLC650’s VPC-MAX attachment – as well as the ease of use of its Crane Control System (CCS) – are helping the team stay on schedule. The Champlain Bridge connects one of North America’s busiest road