Skip to main content

Japanese firm building Vietnam link

Japanese firm Sumitomo Mitsui is handling a US$52 million contract to build a section of the planned elevated expressway in Hanoi.
February 24, 2012 Read time: 1 min
Japanese firm 2714 SUMITOMO Mitsui is handling a US$52 million contract to build a section of the planned elevated expressway in Hanoi. 2714 SUMITOMO Mitui won the second tender package for the elevated link. The deal involves constructing four 840m long ramps and a 2km viaduct with 53 spans that will connect Trung Hoa and Thanh Xuan areas. The work is expected to take 913 days to complete. This forms part of the project to build an 8.9km elevated expressway in southern Hanoi with a total cost of $269.5 million. When complete the elevated expressway will be Vietnam's most modern and will feature the country's longest viaduct. The first tender package was previously awarded by 2560 Vietnam's Ministry of Transport to a consortium called Shamwham-Cienco4. The consortium is building a 3.56km section of the expressway from Mai Dich to Trung Hoa. The third tender package was also won by a consortium, which is called Thang Long Construction Corporation-Cienco8-Cienco4. This tender involves building of the 3.26km elevated part of the expressway from Thanh Xuan to north Linh Dam Lake.

For more information on companies in this article

Related Content

  • Contracts are about to be signed for the Fehmarnbelt Fixed Link
    March 13, 2015
    Nearly eight years after Denmark and Germany agreed to construct a major undersea road and rail tunnel, the first contracts are about to be signed. David Arminas reports. Construction is due to start later this year on one of Europe’s most ambitious, as well as the world’s longest, road and rail tunnels, the 17.6km Fehmarnbelt Fixed Link between Germany and Denmark. Fehmarnbelt is expected to cost around US$7.5 billion and be five times the length of the Øresund tunnel between the Danish capital Copenhagen
  • Astaldi begins drilling tunnels on Poland’s S7 dual carriageway
    March 14, 2017
    Italian contractor Astaldi has begun drilling two parallel tunnels as part of its S7 dual carriageway project in Poland. Each tunnel, between Naprawa and Skomielna Biala and under the Lubon Maly massif, will each be just over 2km long. Astaldi, based in Rome, won the three-year S7 dual carriageway project worth around €225 million in 2016 Work includes 38 bridges and viaducts and three motorway services. There will also be 25km of access roads and two junctions. The north-south S7, when complete
  • Mostostal Warszawa picked for S19 segment
    August 11, 2022
    The contract in northern Poland is worth around €211 million.
  • Vietnam's mighty road budget
    February 7, 2012
    A massive budget for highway construction and upgrading is being set in place by the Vietnamese authorities. In all some US$18.73 billion is being set aside for the construction and development of Vietnam's expressway system.