Skip to main content

Itinera wins Sweden’s Skurusunds Bridge near Stockholm

Italian contractor Itinera will build the new 99m-long and 31m-wide Skurusunds Bridge near Stockholm in Sweden. Trafikverket, the Swedish transport administration, awarded the €75 million contract to Itinera, part of Gruppo Gavio. The new bridge will be parallel to the existing bridge which will remain. It handles around 52,000 vehicles daily, many of them commuting to and from Stockholm. Work will include improvements to traffic junctions at Skuru and Björknäs. The four-lane steel bridge will have
January 21, 2019 Read time: 2 mins
Architect DISSING+WEITLING says that the new bridge is “simple yet technically advanced” (photos courtesy DISSING+WEITLING)

Italian contractor Itinera will build the new 99m-long and 31m-wide Skurusunds Bridge near Stockholm in Sweden.

1096 Trafikverket, the 3530 Swedish transport administration, awarded the €75 million contract to Itinera, part of Gruppo Gavio.

The new bridge will be parallel to the existing bridge which will remain. It handles around 52,000 vehicles daily, many of them commuting to and from Stockholm. Work will include improvements to traffic junctions at Skuru and Björknäs.

The four-lane steel bridge will have an orthotropic deck of five spans and be part of a larger 317m-long motorway project at the site across the Skurusund in the municipality of Nacka, east of Stockholm.

The new bridge’s five spans will include a single 99m span with two side spans on the eastern side (68.4m and 45.1m) and two side spans on the western side (63.5m and 41m).

Architect DISSING+WEITLING, as the engineering design consultant, says that the new bridge is “simple yet technically advanced”, without towers, cables or viewing platforms. The bridge has a slender, aerodynamic steel deck “and it is made as transparent as possible by…. aligning the piers of the new bridge with those of the existing bridge”. The effect is “a connection between the two structures, and the new bridge will not block the view of the old”.

Other engineers for the bridge are 2782 WSP Sweden as planning consultant while ELU Konsult and Leonhardt Andra and Partners are acting as the project’s civil engineer. Completion is scheduled for the fourth quarter of 2021 when renovation and rebuilding of the existing bridge will start and likely finish in 2023.

The existing 284m-long Skuru Bridge is, in fact, two bridges side by side. Together they have a 32m vertical clearance and a span of 78m. According to Trafikverket, the oldest (southern) bridge is one of the first concrete arched bridges in Sweden. It was designed and constructed by AB Arcus with Lars Isak Wahlman as consulting architect between 1913-1915.

The northern bridge was constructed between 1953-57 when the original bridge was extensively remodelled. Although half of the secondary columns were removed, the essential form and aesthetical awareness of the original bridge was maintained.

For more information on companies in this article

Related Content

  • Prague to replace the 90-year-old Liben Bridge
    May 8, 2018
    The Czech capital Prague will replace the deteriorating 90-year-old Liben Bridge at a cost of more than €20 million. The 370m-long bridge over the River Vlatava connects the city quarters of Holešovice and Libeň. It was closed to traffic for several weeks earlier this year for emergency but temporary repairs, according to Prague media. Replacement will include a similarly long bridge plus 400m of roads on either bank of the river but be built on the existing bridge piers. Like the old bridge , it will
  • England’s A14 project River Great Ouse Viaduct completed
    February 28, 2019
    Construction of the biggest bridge in Highways England’s €1.73 billion A14 Cambridge-to-Huntingdon upgrade has been completed. The River Great Ouse Viaduct stretches for 0.8km and when opened to traffic next year will take the new A14 road over the floodplain and the East Coast Mainline Railway line. Work began in November 2016 on the bridge that is part of a new 27.4km bypass under construction to the south of Huntingdon and away from the existing A14. The road is being widened to three lanes in both
  • Far from formulaic
    January 4, 2013
    Formwork solutions for the first axial suspension cable stayed bridge in India; and a four-lane road bridge in Germany’s Harz Mountains, are among the latest bridge-based formwork projects analysed by Guy Woodford. RMD Kwikform India has won the contract to design and supply shoring and formwork solutions for the first axial suspension cable stayed bridge ever built in India. The Kota Bridge’s innovative design sees a single 350m span cross the entire width of the Chambal River, with three approach spans on
  • PERI fills gap in Greek market
    February 19, 2013
    A team of Greek and German PERI engineers have developed a comprehensive formwork and scaffolding solution for the T4 bridge on the A7 motorway in Greece. The 160km long A7 connects Kalamata in the south to Corinth in the northwest of the Peloponnese peninsula. On one stretch of the motorway a 390m long arched bridge – known as T4 – is being used to close the gap between Paradisia and Tsakona. Set for completion in early 2014, two-thirds of the 22m wide bridge superstructure will be suspended on a steel arc