Skip to main content

Italy Genoa bridge rebuild

A design by Italian architect, Renzo Piano, has been selected to replace the Morandi Bridge in Genoa. The new bridge design was submitted to the authorities in Genoa as a proposal in September. Piano is said to be Italy’s most famous living architect and is originally from the city of Genoa himself. The new structure will be built largely from steel and Piano claims that it will be able to last 1,000 years. The new bridge will be built by a consortium comprising the Italian contractors, Salini Impregi
December 19, 2018 Read time: 1 min
A design by Italian architect, Renzo Piano, has been selected to replace the Morandi Bridge in Genoa. The new bridge design was submitted to the authorities in Genoa as a proposal in September.


Piano is said to be Italy’s most famous living architect and is originally from the city of Genoa himself.

The new structure will be built largely from steel and Piano claims that it will be able to last 1,000 years. The new bridge will be built by a consortium comprising the Italian contractors, 7809 Salini Impregilo, Fincantieri and Italferr. Building the new bridge is expected to cost €202 million.

Piano’s most famous works are located in Paris. He designed the Pompidou Centre in partnership with British architect Richard Rogers. He also designed the new Palais de Justice in Paris.

For more information on companies in this article

Related Content

  • Second Danube bridge construction approved
    May 15, 2012
    Official approval is now being given for changes to the agreement between the Bulgarian authorities and the European Investment Bank (EIB) for the second Danube bridge project. So far the EIB is providing €50 million, with €5 million having already been used. The Bulgarian authorities are agreeing to accept a shorter loan period of 14.5 years rather than the 17-year term originally agreed with the EIB.
  • Canada: work officially starts on Montreal’s Champlain Bridge
    June 25, 2015
    Canada’s infrastructure minister, Denis Label, officially broke ground for Montreal’s replacement Champlain Bridge, saying the project will likely cost US$3.42 billion. The 3.4km Champlain Bridge Corridor Project, including spans and highway expansions, is expected to be completed by 2019. SNC-Lavalin, the 50% stakeholder in the winning consortium Signature on the Saint-Lawrence, recently announced it had finalised the deal with new Champlain Bridge owner Infrastructure Canada. Signature on the Saint-
  • New tunnel link proposed for Colombia
    July 23, 2013
    Even as work continues on La Linea tunnel in Colombia, the country’s government has received a proposal for an additional tunnel link. A consortium made up of Colombian companies and Italian firms has suggested building a new tunnel to link Quindio and Tolima. Odinsa, Mincivil, Impregilo and Salini are involved in the consortium and have suggested a PPP as being a possible model under which to construct the link, which could cost in the order of US$531 million and would be 8.5km long. The economic case for
  • Times they are a changing
    July 23, 2012
    Construction in China still appears to be on course for growth even with the gloomy economic outlook, as it enjoys "a strong budgets position." Patrick Smith reports One thing is certain in the current global economic climate: nothing is certain. And while China has not been unaffected by the economic events of recent months it has, according to Robert Zoellinck, president of the World Bank, a very strong current account and budgetary position. For some years, the nation has enjoyed double digit growth (the