Skip to main content

Italian highway viaduct collapses

Heavy rain is thought to be the cause for the collapse of a section of highway viaduct in Italy.
November 27, 2019 Read time: 1 min

A 30m section of the A6 Autostrada dei Fiori (E717) route was wrecked by a mudslide. Emergency workers said that no vehicles were washed away by the collapse, which occurred around 1.5km from Savona in Liguria. This section of highway connects Savona with Turin and is managed by 4814 ASTM, a division of Gruppo Gavio. A single lane bridge will be built as a temporary replacement for the two lane viaduct and this is expected to take three to four months to complete.

Also in Liguria, a 20km stretch of the A26 (E25) route that connects Genoa and Gravellona Toce has been closed. There are concerns that the Pecetti and Fado Nord viaducts are at risk of collapse due to the extreme weather conditions.

For more information on companies in this article

Related Content

  • Safety barriers offer positive workzone protection
    February 10, 2012
    A road project in Utah has benefited from the use of effective barrier protection during construction. *Paul Grant reports An upgraded section of road from 3500 South in West Valley City, Utah, is now open to traffic. The link was completely rebuilt by Utah DoT (UDOT) from the Bangerter Highway to 2700 West, and the road carries traffic from West Valley toward downtown Salt Lake City and the University of Utah. The work added two centre lanes, which are now the first dedicated Bus Rapid Transit lanes in Uta
  • Brisbane's highway of distinction
    August 2, 2012
    A massive AU$2 billion update of the Gateway Motorway in Queensland is underway to improve an infrastructure stretched by population boom. Report and photographs by Adrian Greeman Just 20 years after the Australian city of Brisbane built its Gateway Motorway with a high slim signature bridge dominating the river skyline, the road is being completely revamped. Some 12km of urban route on the south of the Brisbane River is being expanded to take much increased traffic levels; the north is getting a completely
  • PERI fills gap in Greek market
    February 19, 2013
    A team of Greek and German PERI engineers have developed a comprehensive formwork and scaffolding solution for the T4 bridge on the A7 motorway in Greece. The 160km long A7 connects Kalamata in the south to Corinth in the northwest of the Peloponnese peninsula. On one stretch of the motorway a 390m long arched bridge – known as T4 – is being used to close the gap between Paradisia and Tsakona. Set for completion in early 2014, two-thirds of the 22m wide bridge superstructure will be suspended on a steel arc
  • Seven Italian road tenders opening
    March 9, 2023
    Seven Italian road tenders are opening for bids.