Skip to main content

Italian highway viaduct collapses

Heavy rain is thought to be the cause for the collapse of a section of highway viaduct in Italy.
November 27, 2019 Read time: 1 min

A 30m section of the A6 Autostrada dei Fiori (E717) route was wrecked by a mudslide. Emergency workers said that no vehicles were washed away by the collapse, which occurred around 1.5km from Savona in Liguria. This section of highway connects Savona with Turin and is managed by 4814 ASTM, a division of Gruppo Gavio. A single lane bridge will be built as a temporary replacement for the two lane viaduct and this is expected to take three to four months to complete.

Also in Liguria, a 20km stretch of the A26 (E25) route that connects Genoa and Gravellona Toce has been closed. There are concerns that the Pecetti and Fado Nord viaducts are at risk of collapse due to the extreme weather conditions.

For more information on companies in this article

Related Content

  • A new highway for northern Colombia
    July 17, 2023
    The Pamplona-Cúcuta highway is playing an important role for the development of northern Colombia
  • £317 million UK highway project delayed
    February 12, 2025
    A £317 million UK highway project is delayed.
  • Sunderland’s New Wear Crossing takes shape
    February 16, 2017
    The New Wear Crossing will be the first bridge to be built over the River Wear in Sunderland, UK, for more than 40 years Raising the bridge’s 100m-tall pylon promised to be a stunning visual sight, but also a tricky operation dictated by extremely variable local weather. World Highways went to press just before the operation, but not before the pylon had arrived by barge on January 7. It had completed a two-day crossing of the often unpredictable North Sea from the Belgian port of Ghent where it was f
  • BAM, Morgan Sindall start UK’s €112 million Oldbury viaduct job
    July 31, 2017
    A joint venture of BAM, Morgan Sindall and VolkerFitzpatrick has started refurbishing the Oldbury viaduct on the UK’s M5 motorway. The €112 million project will see repairs to a 3.5km stretch between junctions 1 and 2 of the motorway – one of the UK’s busiest routes – to the west of Birmingham city. Work is being done in three phases starting with the removal of the road surface on the southbound carriageway to investigate the condition of the concrete deck.