Skip to main content

Italian highway viaduct collapses

Heavy rain is thought to be the cause for the collapse of a section of highway viaduct in Italy.
November 27, 2019 Read time: 1 min

A 30m section of the A6 Autostrada dei Fiori (E717) route was wrecked by a mudslide. Emergency workers said that no vehicles were washed away by the collapse, which occurred around 1.5km from Savona in Liguria. This section of highway connects Savona with Turin and is managed by 4814 ASTM, a division of Gruppo Gavio. A single lane bridge will be built as a temporary replacement for the two lane viaduct and this is expected to take three to four months to complete.

Also in Liguria, a 20km stretch of the A26 (E25) route that connects Genoa and Gravellona Toce has been closed. There are concerns that the Pecetti and Fado Nord viaducts are at risk of collapse due to the extreme weather conditions.

For more information on companies in this article

Related Content

  • Forming iconic structures
    July 18, 2012
    Specially designed and constructed formwork is being used to create some iconic bridges worldwide The Golden Ears Bridge over the Fraser River will unite the municipalities of Richmond, New Westminister and Delta in the scenic British Columbia province of Canada. The bridge, part of a CAD$800 million (US$670 million) project, is an 'extra dosed' cable stayed bridge, which means the deck will be supported by both cables and the structure itself. This design reduces the overall height of the two towers as req
  • Chilean highway project faces questions
    February 14, 2012
    The plans for Chile's new Vespucio Oriente highway are under a question mark at present. The Chilean Construction Chamber (CChC) and the association of concession-holders (COPSA) have raised concerns over the plans by the country's government to press ahead with the construction of the 13km Vespucio Oriente highway in capital Santiago.
  • Seal of approval
    August 2, 2012
    Timely maintenance using proven cost-effective methods can extend the life of a highway by many years as Patrick smith reports Highways are expensive assets to construct, and the wear and tear of modern traffic means that regular maintenance will delay costly repairs or in extreme cases reconstruction. There are a number of methods of carrying out such maintenance, and these include the use of slurry seals and micro-surfacing, which are cold mixed asphalt which is a mixture of graded aggregate, asphalt emul
  • Act FAST when it comes to bridge maintenance, argues Cliff Weston
    February 27, 2017
    Deck waterproofing remains critical to a bridge’s structural integrity for its design life, explains Cliff Weston, director of Stirling Lloyd To properly maintain deck waterproofing there must be a willingness to look at solutions based on whole-life costing rather than just short-term initial costs. There are lessons to be learned from examples of prematurely failed infrastructure due to a focus on initial short-term costs.