Skip to main content

Italian highway viaduct collapses

Heavy rain is thought to be the cause for the collapse of a section of highway viaduct in Italy.
November 27, 2019 Read time: 1 min

A 30m section of the A6 Autostrada dei Fiori (E717) route was wrecked by a mudslide. Emergency workers said that no vehicles were washed away by the collapse, which occurred around 1.5km from Savona in Liguria. This section of highway connects Savona with Turin and is managed by 4814 ASTM, a division of Gruppo Gavio. A single lane bridge will be built as a temporary replacement for the two lane viaduct and this is expected to take three to four months to complete.

Also in Liguria, a 20km stretch of the A26 (E25) route that connects Genoa and Gravellona Toce has been closed. There are concerns that the Pecetti and Fado Nord viaducts are at risk of collapse due to the extreme weather conditions.

For more information on companies in this article

Related Content

  • Brine spraying can boost winter road safety and cut materials costs
    February 16, 2015
    A study on the use of a brine sprayer on the A8 Autobahn in Germany has yielded valuable data - *Jo Rommeswinkel writes. Since 2007, Autobahnplus Services (a+S) has been providing the operation and maintenance services on the 52km concession Autobahn A8 between Munich and Augsburg in Bavaria, a region renowned for its severe winter maintenance conditions. The Munich Augsburg section comprises 48km of six-lane dual carriageway and 4km of four-lane dual carriageway. Part of the road surface consists of low-no
  • Installation underway of first UK M4/M5 ‘superspan’ gantries
    July 4, 2012
    The installation is underway of the first superspan gantries on the M4/M5 managed motorway scheme. The existing gantries and infrastructure were successfully removed last month while the new steel gantries were being constructed, fitted-out and tested at a dedicated facility located near junction 17 of the M5, before being delivered to the works site. A total of 33 new overhead gantries, a number of which span 50m and weigh over 30tonnes, will be installed along the new managed motorway section up until T
  • Iowa-Wisconsin bridge link demolition
    July 23, 2025
    A historic Iowa-Wisconsin bridge link will be demolished.
  • Hungarian bypass contract for STRABAG
    September 14, 2021
    STRABAG has been awarded a major Hungarian bypass contract.