Skip to main content

Italian highway viaduct collapses

Heavy rain is thought to be the cause for the collapse of a section of highway viaduct in Italy.
November 27, 2019 Read time: 1 min

A 30m section of the A6 Autostrada dei Fiori (E717) route was wrecked by a mudslide. Emergency workers said that no vehicles were washed away by the collapse, which occurred around 1.5km from Savona in Liguria. This section of highway connects Savona with Turin and is managed by 4814 ASTM, a division of Gruppo Gavio. A single lane bridge will be built as a temporary replacement for the two lane viaduct and this is expected to take three to four months to complete.

Also in Liguria, a 20km stretch of the A26 (E25) route that connects Genoa and Gravellona Toce has been closed. There are concerns that the Pecetti and Fado Nord viaducts are at risk of collapse due to the extreme weather conditions.

For more information on companies in this article

Related Content

  • India’s longest road tunnel continues apace with Atlas Copco support
    May 20, 2014
    The challenging construction of India’s largest road tunnel is part of a vital US$500 million project aiming to connect the isolated northern state of Jammu and Kashmir with the rest of the vast and highly populated country. Guy Woodford reports Travelling on National Highway 1A (NH 1A) in northern India should be the dictionary definition of ordeal. The single lane, narrow and winding road crosses some of the steepest, most treacherous terrain on the planet. The arduous route becomes especially difficult t
  • Polish projects provide transport plan
    September 19, 2014
    Poland is planning to enter seven transport projects to the Connecting Europe Programme, with these having a combined value close to €2.86 billion. Among the planned projects are the S61 express road between the Lithuanian border and Augustow. Meanwhile STRABAG and Budimex have formed a consortium that will construct a 41km stretch of the A4 highway in Poland. The section of the route runs from Rzeszów to Jarosław, in south-eastern Poland. The project is expected to take 14 months to complete and the contra
  • Nepal highway subsidence problem causing traffic disturbance
    March 11, 2017
    Subsidence on a key stretch of highway in Nepal is causing major traffic disturbance. The BP Highway, also known as the Banepa- Sindhuli- Bardibas Road, has suffered subsidence on the Nepalthok-Khurkot stretch. The collapsed section measures 27m long and is causing delays for drivers. This Highway is an important route as it connets Nepal’s capital Kathmandu with Eastern Terai. Vehicles have been diverted to an alternative route, although part of the roadway is still being used to carry traffic in one d
  • Steel for Loch Ba bridge
    February 6, 2012
    Allerton Steel, on behalf of R J McLeod, has fabricated the steelwork for a replacement bridge at Loch Ba on Rannoch Moor in the Highlands as part of its A82 upgrade scheme for Transport Scotland. R J McLeod is the civil contractor on the £2.2 million (E2.6 million) scheme which replaces the existing three-span reinforced concrete bridge.