Skip to main content

Istanbul’s third bridge nearly ready

Work is progressing well in Turkey on the country’s landmark new bridge over the Bosporus. This will be Istanbul's third bridge, with the opening now planned for the 29th October 2015. The construction work is being carried out by the IC Ictas – Astaldi joint venture, which is handling the project under the build-operate-transfer (BOT) model. The project has an investment value of some US$2.5 billion. The landmark 3rd Bosporus Bridge, or Yavuz Sultan Selim Bridge, forms the centrepiece of the Northern Marma
February 2, 2015 Read time: 1 min
Work on Istanbul’s third bridge over the Bosporus is nearing completion
Work is progressing well in Turkey on the country’s landmark new bridge over the Bosporus. This will be Istanbul's third bridge, with the opening now planned for the 29th October 2015. The construction work is being carried out by the 3015 IC Ictas – 1324 Astaldi joint venture, which is handling the project under the build-operate-transfer (BOT) model. The project has an investment value of some US$2.5 billion. The landmark 3rd Bosporus Bridge, or Yavuz Sultan Selim Bridge, forms the centrepiece of the Northern Marmara Motorway project. The new bridge is breaking several records for Turkey in terms of scale, as well as setting a number of international records for engineering. Its towers will also be the tallest in the world. And the towers for the bridge have already reached the height of 292m in the European side and 288m on the Anatolian side.

For more information on companies in this article

Related Content

  • Intermat Middle East positions itself for growth
    October 17, 2012
    As the United Arab Emirates gears up to invest more than US $4.6 billion (UAE Dirham 17 billion) in its nationwide road network in the next few years, the second annual INTERMAT Middle East show has taken place in Abu Dhabi with suppliers like AAA Cranes, Miller UK, Kanoo, Liebherr, Sennebogen, WireCo World, Erkat, Terex Finlay, Atlas Copco, , ELSA SRL, Robit Rock Tools, Ramtec Robi, Scheuerle Fahrzeugfabrik, T.G.S – The Grab Specialist, BV Beco, Techking Tires, Blastrac, SK Solutions, Xcentric Internationa
  • Speed and precision make for perfect tunnelling combination
    May 21, 2014
    Speed and precision have been the hallmarks of a number of major road tunnelling projects across the globe over the last 12 months, as the latest sector equipment from leading manufacturers has found itself in high demand. Guy Woodford reports Herrenknecht tunnel boring machines (TBM) have been busy tunnelling under major Chinese rivers, demonstrating phenomenal speed, top safety levels and extreme precision while playing a key role in the construction of road tunnels in the Yangtze River Delta. The Yang
  • Case demonstrates machines in Tunisia
    February 13, 2017
    CASE Construction Equipment recently carried out a major demonstration event for its construction machines in Tunisia. The event focused on the firm’s road building equipment, highlighting how the units perform, even in extreme conditions The planned large-scale projects for the development of Tunisia’s road infrastructure will require highly productive and reliable equipment to meet the country’s objectives. CASE is keen to develop a share of this market, running the event in a bid to grow its marke
  • Asian bitumen producers look overseas for business opportunities
    March 4, 2015
    While demand in some parts of Asia is strong, other countries such as China have been suffering from oversupply - World Highways reported from the Argus Asia-Pacific and Middle East Bitumen Conference in Singapore. Asia overtook the Americas as the world’s largest consumer of bitumen in 2012, with China accounting for the lion’s share – nearly two-thirds – of consumption. However, attendees at the Argus Asia-Pacific and Middle East Bitumen Conference held in Singapore on 24th-26th September last year heard