Skip to main content

Istanbul’s third bridge nearly ready

Work is progressing well in Turkey on the country’s landmark new bridge over the Bosporus. This will be Istanbul's third bridge, with the opening now planned for the 29th October 2015. The construction work is being carried out by the IC Ictas – Astaldi joint venture, which is handling the project under the build-operate-transfer (BOT) model. The project has an investment value of some US$2.5 billion. The landmark 3rd Bosporus Bridge, or Yavuz Sultan Selim Bridge, forms the centrepiece of the Northern Marma
February 2, 2015 Read time: 1 min
Work on Istanbul’s third bridge over the Bosporus is nearing completion
Work is progressing well in Turkey on the country’s landmark new bridge over the Bosporus. This will be Istanbul's third bridge, with the opening now planned for the 29th October 2015. The construction work is being carried out by the 3015 IC Ictas – 1324 Astaldi joint venture, which is handling the project under the build-operate-transfer (BOT) model. The project has an investment value of some US$2.5 billion. The landmark 3rd Bosporus Bridge, or Yavuz Sultan Selim Bridge, forms the centrepiece of the Northern Marmara Motorway project. The new bridge is breaking several records for Turkey in terms of scale, as well as setting a number of international records for engineering. Its towers will also be the tallest in the world. And the towers for the bridge have already reached the height of 292m in the European side and 288m on the Anatolian side.

For more information on companies in this article

Related Content

  • Vietnam’s major road and bridge projects
    September 27, 2021
    Work continues for Vietnam’s major road and bridge projects.
  • Astaldi expects to close €1.7bn Russian motorway build deal
    May 13, 2014
    Italian civil engineering group Astaldi is expecting to obtain a €1.7 billion contract from Russia that would see them build a 140km stretch of the Moscow-St Petersburg motorway. Astaldi chairman Paolo Astaldi said that the deal for lots seven and eight of the motorway is “probable”. Astaldi is in a consortium with Turkish partner Ictas, with which it has already banked deals in Russia. The contract will be awarded by the motorway concessionaires, VTB and Vinci.
  • Export focus for XCMG, with Latin America as key territory
    November 13, 2014
    Exports are crucial to XCMG’s growth and its aim to becoming a dominant player in the worldwide construction machinery market – Mike Woof writes One of China’s biggest construction equipment manufacturers, XCMG has a high profile, and particularly in the country’s home market. XCMG is a leader in key equipment categories such as concrete pumping and lifting technologies. The firm’s 4,000tonne crawler crane introduced two years ago has already proven its worth in a massive industrial construction appl
  • Export focus for XCMG, with Latin America as key territory
    January 6, 2017
    Exports are crucial to XCMG’s growth and its aim to becoming a dominant player in the worldwide construction machinery market – Mike Woof writes One of China’s biggest construction equipment manufacturers, XCMG has a high profile, and particularly in the country’s home market. XCMG is a leader in key equipment categories such as concrete pumping and lifting technologies. The firm’s 4,000tonne crawler crane introduced two years ago has already proven its worth in a massive industrial construction appl