Skip to main content

Istanbul’s third bridge nearly ready

Work is progressing well in Turkey on the country’s landmark new bridge over the Bosporus. This will be Istanbul's third bridge, with the opening now planned for the 29th October 2015. The construction work is being carried out by the IC Ictas – Astaldi joint venture, which is handling the project under the build-operate-transfer (BOT) model. The project has an investment value of some US$2.5 billion. The landmark 3rd Bosporus Bridge, or Yavuz Sultan Selim Bridge, forms the centrepiece of the Northern Marma
February 2, 2015 Read time: 1 min
Work on Istanbul’s third bridge over the Bosporus is nearing completion
Work is progressing well in Turkey on the country’s landmark new bridge over the Bosporus. This will be Istanbul's third bridge, with the opening now planned for the 29th October 2015. The construction work is being carried out by the 3015 IC Ictas – 1324 Astaldi joint venture, which is handling the project under the build-operate-transfer (BOT) model. The project has an investment value of some US$2.5 billion. The landmark 3rd Bosporus Bridge, or Yavuz Sultan Selim Bridge, forms the centrepiece of the Northern Marmara Motorway project. The new bridge is breaking several records for Turkey in terms of scale, as well as setting a number of international records for engineering. Its towers will also be the tallest in the world. And the towers for the bridge have already reached the height of 292m in the European side and 288m on the Anatolian side.

For more information on companies in this article

Related Content

  • Mini-bridge aids Forth repairs
    July 17, 2012
    An engineering "first" means that rehabilitation work on a vital Scottish bridge built over 40 years ago can be carried out smoothly A new report to the Forth Estuary Transport Authority (FETA) in Scotland recommends appointing Balfour Beatty Civil Engineering of Edinburgh as 'preferred bidder' to carry out the scheduled replacement of the bridge's main expansion joints in 2009. However, the report to the bridge authority says the tender price of £13.7 million (US$21.3 million) is some £5 million ($7.8 mill
  • Romanian road revamp
    April 30, 2012
    Romania's long planned highway expansion programme is finally gathering pace. Funding for the projects has been provided but although many feasibility studies had been carried out, little work had been carried out until now.
  • Scotland’s Queensferry Crossing opens to traffic
    August 30, 2017
    The new Queensferry Crossing in Scotland is now open to traffic, with the first vehicles crossing at 2am this morning. The landmark design has set precedents in engineering, its three 207m high towers making it the tallest of its type in the UK and at 2.7km, also the longest three tower cable-stayed bridge built anywhere in the world. The bridge has a design life of 150 years and features two traffic lanes in either direction, as well as emergency lanes on either side. The new bridge will help reduce the ch
  • Sunderland’s New Wear Crossing takes shape
    February 16, 2017
    The New Wear Crossing will be the first bridge to be built over the River Wear in Sunderland, UK, for more than 40 years Raising the bridge’s 100m-tall pylon promised to be a stunning visual sight, but also a tricky operation dictated by extremely variable local weather. World Highways went to press just before the operation, but not before the pylon had arrived by barge on January 7. It had completed a two-day crossing of the often unpredictable North Sea from the Belgian port of Ghent where it was f